Hi,
I’ve set up an assembly BOM as follows follows:
Level 0: AS123456
Level 1: SA123456
Level 2: DP123456
All of the parts have ‘Process MRP’ ticked and approved Methods of Manufacture against them. However, when I run MRP, job suggestions are only created for level 0, and not the below levels.
Does anyone know why this might be?
Many thanks
Edit: Found the issue. I had ‘Pull as Assembly’ ticked on the lower level parts, so the lower-levels were actually within the top-level job.