We only have 1 plant.
-
For the first two jobs, it did as would be expected, pushed them out to the end of the schedule where there was room on the machine available:
But for job 055027 it pushed it out but still scheduled it on top of job 055663.
10:18:06 Multi Job Shedule Log - First job moved: 055027
10:18:06 Version 10.1.500 current. 500.19 - 04/05/2017 - 16:00
10:18:06 Ignore Material Constraints = False
10:18:06 Minimize WIP = True
10:18:06 Ignore locked jobs = True
10:18:06 The job 055027 is moved individually
10:18:15
10:18:15 Finished Multi Job Scheduling of 055027
300 results - 1 file
\Untitled-7:
537 10:18:06 Capability efficiency for M-10001-THW primary operation detail. Time 0 --- processCapability
538: 10:18:06 Processing Resource M290 --- processCapability
539 10:18:06 Adjust Setup time by 1 to 0.0 --- GetTimeBlock
540 10:18:06 Adjust ProdTime by 1 to 0 --- GetTimeBlock
541: 10:18:06 ***Scheduling resource M290 for 0.0 hours --- processResourceID
542 10:18:06 Queue Time is not calculated because: the first asm operation doesn't need queue time.. (runForwardResSched) --- runForwardResSched
543: 10:18:06 Infinitely scheduling resource M290 FiniteHorizonDate 9/30/2021 ScheduleStartDate 9/30/2021 --- GetForwardDateTime
544: 10:18:06 Scheduling resource M290 time: 9/30/2021 0 --- GetForwardDateTime
545: 10:18:06 Looking for next scheduled time on resource M290 Starting from 9/30/2021 and a start hour of 0 --- GetForwardDateTime
546: 10:18:06 Found end date and time for resource M290 to be 9/30/2021 0 --- GetForwardDateTime
547: 10:18:06 Scheduled resource M290 on 9/30/2021 Starting 0 for 0.0 hours Ending 9/30/2021 Hour 0. --- processResourceID
548: 10:18:06 Scheduling Resource M290 for job 055027 Operation 10 Priority 100 StartDate 9/30/2021 EndDate 9/30/2021. --- processResourceID
549: 10:18:06 ******Done Scheduling Resource M290 for job 055027 Operation 10 Priority 100 StartDate 9/30/2021 EndDate 9/30/2021. --- processResourceID
550: 10:18:06 ***Done Scheduling Resource M290 for job 055027 Operation 10 Priority 100 StartDate 9/30/2021 EndDate 9/30/2021 Move Date 9/30/2021. --- processResourceID
551: 10:18:06 *First available time for Resource M290 is 9/30/2021 at 0 (0) ending on 9/30/2021 at 0 for 0 hours. Move Date 9/30/2021 Move Hour 0. --- processResourceID
552: 10:18:06 Found time for M290 on 9/30/2021 0 ending 9/30/2021 0 Priority 1000 with Forward = _Forward. --- _SetPriority
553: 10:18:06 **2Chose Resource - M290 Time: Queue 9/30/2021 - 0, Start 9/30/2021 - 0, End 9/30/2021 - 0, Move 9/30/2021 - 0. --- OpDtlFdProduction
554 10:18:06 Checking if we should keep processing l_DateChanged False of Job: False l-OpMastSchedChange False l-TimeblockChange False iBeatCounter 0 --- Checkdatechange
555 10:18:06 ****Created RTU for job 055027 Operation 10 with start date of 9/30/2021 and enddate of 9/30/2021 --- createTTResourceTimeUsed
556: 10:18:06 Consolidating calendar with resource M290 --- OpDtlFdProduction
557 10:18:06 -Forward Scheduling Job - 055027 Assem - 2 Operation - 10 Sequence - 10 - <S>etup/<P>roduction/<B>oth: B for a Setup time of 0.25 and Production Time of 0.25. --- OperationForward
685 10:18:06 Capability efficiency for M-10001-THW primary operation detail. Time 0 --- processCapability
686: 10:18:06 Processing Resource M290 --- processCapability
687 10:18:06 Adjust Setup time by 1 to 0.0 --- GetTimeBlock
688 10:18:06 Adjust ProdTime by 1 to 0 --- GetTimeBlock
689: 10:18:06 ***Scheduling resource M290 for 0.0 hours --- processResourceID
690 10:18:06 Queue Time is not calculated because: the first asm operation doesn't need queue time.. (runForwardResSched) --- runForwardResSched
691: 10:18:06 Infinitely scheduling resource M290 FiniteHorizonDate 9/30/2021 ScheduleStartDate 9/30/2021 --- GetForwardDateTime
692: 10:18:06 Scheduling resource M290 time: 9/30/2021 0 --- GetForwardDateTime
693: 10:18:06 Looking for next scheduled time on resource M290 Starting from 9/30/2021 and a start hour of 0 --- GetForwardDateTime
694: 10:18:06 Found end date and time for resource M290 to be 9/30/2021 0 --- GetForwardDateTime
695: 10:18:06 Scheduled resource M290 on 9/30/2021 Starting 0 for 0.0 hours Ending 9/30/2021 Hour 0. --- processResourceID
696: 10:18:06 Scheduling Resource M290 for job 055027 Operation 10 Priority 100 StartDate 9/30/2021 EndDate 9/30/2021. --- processResourceID
697: 10:18:06 ******Done Scheduling Resource M290 for job 055027 Operation 10 Priority 100 StartDate 9/30/2021 EndDate 9/30/2021. --- processResourceID
698: 10:18:06 ***Done Scheduling Resource M290 for job 055027 Operation 10 Priority 100 StartDate 9/30/2021 EndDate 9/30/2021 Move Date 9/30/2021. --- processResourceID
699: 10:18:06 *First available time for Resource M290 is 9/30/2021 at 0 (0) ending on 9/30/2021 at 0 for 0 hours. Move Date 9/30/2021 Move Hour 0. --- processResourceID
700: 10:18:06 Found time for M290 on 9/30/2021 0 ending 9/30/2021 0 Priority 1000 with Forward = _Forward. --- _SetPriority
701: 10:18:06 **2Chose Resource - M290 Time: Queue 9/30/2021 - 0, Start 9/30/2021 - 0, End 9/30/2021 - 0, Move 9/30/2021 - 0. --- OpDtlFdProduction
702 10:18:06 Checking if we should keep processing l_DateChanged False of Job: False l-OpMastSchedChange False l-TimeblockChange False iBeatCounter 0 --- Checkdatechange
703 10:18:06 ****Created RTU for job 055027 Operation 10 with start date of 9/30/2021 and enddate of 9/30/2021 --- createTTResourceTimeUsed
704: 10:18:06 Consolidating calendar with resource M290 --- OpDtlFdProduction
705 10:18:06 -Forward Scheduling Job - 055027 Assem - 3 Operation - 10 Sequence - 10 - <S>etup/<P>roduction/<B>oth: B for a Setup time of 0.25 and Production Time of 0.25. --- OperationForward
957 10:18:06 Capability efficiency for M-10001-THW primary operation detail. Time 0 --- processCapability
958: 10:18:06 Processing Resource M290 --- processCapability
959 10:18:06 Adjust Setup time by 1 to 0.0 --- GetTimeBlock
960 10:18:06 Adjust ProdTime by 1 to 0 --- GetTimeBlock
961: 10:18:06 ***Scheduling resource M290 for 0.0 hours --- processResourceID
962 10:18:06 Queue Time is not calculated because: the first asm operation doesn't need queue time.. (runForwardResSched) --- runForwardResSched
963: 10:18:06 Infinitely scheduling resource M290 FiniteHorizonDate 9/30/2021 ScheduleStartDate 9/30/2021 --- GetForwardDateTime
964: 10:18:06 Scheduling resource M290 time: 9/30/2021 0 --- GetForwardDateTime
965: 10:18:06 Looking for next scheduled time on resource M290 Starting from 9/30/2021 and a start hour of 0 --- GetForwardDateTime
966: 10:18:06 Found end date and time for resource M290 to be 9/30/2021 0 --- GetForwardDateTime
967: 10:18:06 Scheduled resource M290 on 9/30/2021 Starting 0 for 0.0 hours Ending 9/30/2021 Hour 0. --- processResourceID
968: 10:18:06 Scheduling Resource M290 for job 055027 Operation 10 Priority 100 StartDate 9/30/2021 EndDate 9/30/2021. --- processResourceID
969: 10:18:06 ******Done Scheduling Resource M290 for job 055027 Operation 10 Priority 100 StartDate 9/30/2021 EndDate 9/30/2021. --- processResourceID
970: 10:18:06 ***Done Scheduling Resource M290 for job 055027 Operation 10 Priority 100 StartDate 9/30/2021 EndDate 9/30/2021 Move Date 9/30/2021. --- processResourceID
971: 10:18:06 *First available time for Resource M290 is 9/30/2021 at 0 (0) ending on 9/30/2021 at 0 for 0 hours. Move Date 9/30/2021 Move Hour 0. --- processResourceID
972: 10:18:06 Found time for M290 on 9/30/2021 0 ending 9/30/2021 0 Priority 1000 with Forward = _Forward. --- _SetPriority
973: 10:18:06 **2Chose Resource - M290 Time: Queue 9/30/2021 - 0, Start 9/30/2021 - 0, End 9/30/2021 - 0, Move 9/30/2021 - 0. --- OpDtlFdProduction
974 10:18:06 Checking if we should keep processing l_DateChanged False of Job: False l-OpMastSchedChange False l-TimeblockChange False iBeatCounter 0 --- Checkdatechange
975 10:18:06 ****Created RTU for job 055027 Operation 10 with start date of 9/30/2021 and enddate of 9/30/2021 --- createTTResourceTimeUsed
976: 10:18:06 Consolidating calendar with resource M290 --- OpDtlFdProduction
977 10:18:06 -Forward Scheduling Job - 055027 Assem - 4 Operation - 10 Sequence - 10 - <S>etup/<P>roduction/<B>oth: B for a Setup time of 0.25 and Production Time of 0.25. --- OperationForward
1230 10:18:06 Capability efficiency for M-10001-THW primary operation detail. Time 0.16667 --- processCapability
1231: 10:18:06 Processing Resource M290 --- processCapability
1232 10:18:06 Adjust Setup time by 1 to 0.25 --- GetTimeBlock
1233 10:18:06 Adjust ProdTime by 1 to 0.16667 --- GetTimeBlock
1234: 10:18:06 ***Scheduling resource M290 for 0.41667 hours --- processResourceID
1235: 10:18:06 Making production calendar for Resource M290 from production calendar MAIN. --- MakeConResCal
1236: 10:18:06 Making setup calendar MAIN for Resource: M290. --- MakeConResCal
1237 10:18:06 Queue Time is not calculated because: the first asm operation doesn't need queue time.. (runForwardResSched) --- runForwardResSched
1238: 10:18:06 Finitely scheduling resource M290 FiniteHorizonDate 3/29/2022 ScheduleStartDate 9/30/2021 --- GetForwardDateTime
1239: 10:18:06 Scheduling resource M290 time: 9/30/2021 0 --- GetForwardDateTime
1240: 10:18:06 1Looking for conflict on resource M290 on 9/30/2021 and a start hour of 0 (getForwardDateTime) --- GetForwardDateTime
1241: 10:18:06 No Conflict found for Resource M290 on Date: 9/30/2021 Time: 0 --- GetForwardDateTime
1242: 10:18:06 No Conflict found for Resource M290 on Date: 9/30/2021 Time: 0 End Date 9/30/2021 --- GetForwardDateTime
1243: 10:18:06 Checking for next scheduled time on resource M290 after 9/30/2021 is 6 hours. Looking for at least 6 hours. (findNextOpenTimeBlock) --- findNextOpenTimeBlock
1244: 10:18:06 Checking for conflict on resource M290 on 9/30/2021 where LocalResourceTimeUsed.StartTime >= 21600 . (findNextOpenTimeBlock) --- getNextRsrceOpenDateTime
1245 10:18:06 found CONFLICT with starttime for resource = False OP-StartDate 9/30/2021 FirstWorkingTime 21600 . (findNextOpenTimeBlock) --- getNextRsrceOpenDateTime
1246 10:18:06 2 found CONFLICT with starttime for resource = False OP-StartDate 9/30/2021 FirstWorkingTime 21600 . (findNextOpenTimeBlock) --- getNextRsrceOpenDateTime
1247: 10:18:06 Looking for next scheduled time on resource M290 Starting from 9/30/2021 and a start hour of 6 --- GetForwardDateTime
1248: 10:18:06 Found that resource M290 has 17 working hours on 9/30/2021. --- GetNextTotalAvailProdTime
1249 10:18:06 Calculated Endtime is 23112 --- GetNextTotalAvailProdTime
1250: 10:18:06 Found end date and time for resource M290 to be 9/30/2021 6.42 --- GetForwardDateTime
1251: 10:18:06 Scheduled resource M290 on 9/30/2021 Starting 21600 for 0.41667 hours Ending 9/30/2021 Hour 6.42. --- processResourceID
1252: 10:18:06 Scheduling Resource M290 for job 055027 Operation 10 Priority 100 StartDate 9/30/2021 EndDate 9/30/2021. --- processResourceID
1253: 10:18:06 ******Done Scheduling Resource M290 for job 055027 Operation 10 Priority 100 StartDate 9/30/2021 EndDate 9/30/2021. --- processResourceID
1254: 10:18:06 ***Done Scheduling Resource M290 for job 055027 Operation 10 Priority 100 StartDate 9/30/2021 EndDate 9/30/2021 Move Date 9/30/2021. --- processResourceID
1255: 10:18:06 *First available time for Resource M290 is 9/30/2021 at 21600 (6) ending on 9/30/2021 at 6.42 for 0.4166666666666666666666666667 hours. Move Date 9/30/2021 Move Hour 6.42. --- processResourceID
1256: 10:18:06 Found time for M290 on 9/30/2021 21600 ending 9/30/2021 23112 Priority 1000 with Forward = _Forward. --- _SetPriority
1257: 10:18:06 **2Chose Resource - M290 Time: Queue 9/30/2021 - 6, Start 9/30/2021 - 21600, End 9/30/2021 - 23112, Move 9/30/2021 - 6.42. --- OpDtlFdProduction
1258 10:18:06 Checking if we should keep processing l_DateChanged False of Job: False l-OpMastSchedChange False l-TimeblockChange False iBeatCounter 0 --- Checkdatechange
1259 10:18:06 ****Created RTU for job 055027 Operation 10 with start date of 9/30/2021 and enddate of 9/30/2021 --- createTTResourceTimeUsed
1260: 10:18:06 Consolidating calendar with resource M290 --- OpDtlFdProduction
1261: 10:18:06 Consolidated Operation Calendar with Resource Calendar: M290 --- Consolcals
1262 10:18:06 ttopmastcal - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x- - - - - - - -x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x- - - - - - - -x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x- - - - - - - -x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x- - - - - - - -x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x- - - - - - - - - - - - - - - - - - - - - - - - - - --- Consolcals
1263 10:18:06 ttopmasOrig True x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x- --- Consolcals
1264: 10:18:06 Consolidated Operation Calendar with Resource Calendar: M290 --- Consolcals
1265 10:18:06 ttopmastcal - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x- - - - - - - -x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x- - - - - - - -x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x- - - - - - - -x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x- - - - - - - -x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x- - - - - - - - - - - - - - - - - - - - - - - - - - --- Consolcals
1541 10:18:06 Capability efficiency for M-10001-THW primary operation detail. Time 0 --- processCapability
1542: 10:18:06 Processing Resource M290 --- processCapability
1543 10:18:06 Adjust Setup time by 1 to 0.0 --- GetTimeBlock
1544 10:18:06 Adjust ProdTime by 1 to 0 --- GetTimeBlock
1545: 10:18:06 ***Scheduling resource M290 for 0.0 hours --- processResourceID
1546 10:18:06 Queue Time is not calculated because: the first asm operation doesn't need queue time.. (runForwardResSched) --- runForwardResSched
1547: 10:18:06 Infinitely scheduling resource M290 FiniteHorizonDate 9/30/2021 ScheduleStartDate 9/30/2021 --- GetForwardDateTime
1548: 10:18:06 Scheduling resource M290 time: 9/30/2021 0 --- GetForwardDateTime
1549: 10:18:06 Looking for next scheduled time on resource M290 Starting from 9/30/2021 and a start hour of 0 --- GetForwardDateTime
1550: 10:18:06 Found end date and time for resource M290 to be 9/30/2021 0 --- GetForwardDateTime
1551: 10:18:06 Scheduled resource M290 on 9/30/2021 Starting 0 for 0.0 hours Ending 9/30/2021 Hour 0. --- processResourceID
1552: 10:18:06 Scheduling Resource M290 for job 055027 Operation 10 Priority 100 StartDate 9/30/2021 EndDate 9/30/2021. --- processResourceID
1553: 10:18:06 ******Done Scheduling Resource M290 for job 055027 Operation 10 Priority 100 StartDate 9/30/2021 EndDate 9/30/2021. --- processResourceID
1554: 10:18:06 ***Done Scheduling Resource M290 for job 055027 Operation 10 Priority 100 StartDate 9/30/2021 EndDate 9/30/2021 Move Date 9/30/2021. --- processResourceID
1555: 10:18:06 *First available time for Resource M290 is 9/30/2021 at 0 (0) ending on 9/30/2021 at 0 for 0 hours. Move Date 9/30/2021 Move Hour 0. --- processResourceID
1556: 10:18:06 Found time for M290 on 9/30/2021 0 ending 9/30/2021 0 Priority 1000 with Forward = _Forward. --- _SetPriority
1557: 10:18:06 **2Chose Resource - M290 Time: Queue 9/30/2021 - 0, Start 9/30/2021 - 0, End 9/30/2021 - 0, Move 9/30/2021 - 0. --- OpDtlFdProduction
1558 10:18:06 Checking if we should keep processing l_DateChanged False of Job: False l-OpMastSchedChange False l-TimeblockChange False iBeatCounter 0 --- Checkdatechange
1559 10:18:06 ****Created RTU for job 055027 Operation 10 with start date of 9/30/2021 and enddate of 9/30/2021 --- createTTResourceTimeUsed
1560: 10:18:06 Consolidating calendar with resource M290 --- OpDtlFdProduction
1561 10:18:06 -Forward Scheduling Job - 055027 Assem - 6 Operation - 10 Sequence - 10 - <S>etup/<P>roduction/<B>oth: B for a Setup time of 0.25 and Production Time of 0.25. --- OperationForward
1814 10:18:06 Capability efficiency for M-10001-THW primary operation detail. Time 0 --- processCapability
1815: 10:18:06 Processing Resource M290 --- processCapability
1816 10:18:06 Adjust Setup time by 1 to 0.0 --- GetTimeBlock
1817 10:18:06 Adjust ProdTime by 1 to 0 --- GetTimeBlock
1818: 10:18:06 ***Scheduling resource M290 for 0.0 hours --- processResourceID
1819 10:18:06 Queue Time is not calculated because: the first asm operation doesn't need queue time.. (runForwardResSched) --- runForwardResSched
1820: 10:18:06 Infinitely scheduling resource M290 FiniteHorizonDate 9/30/2021 ScheduleStartDate 9/30/2021 --- GetForwardDateTime
1821: 10:18:06 Scheduling resource M290 time: 9/30/2021 0 --- GetForwardDateTime
1822: 10:18:06 Looking for next scheduled time on resource M290 Starting from 9/30/2021 and a start hour of 0 --- GetForwardDateTime
1823: 10:18:06 Found end date and time for resource M290 to be 9/30/2021 0 --- GetForwardDateTime
1824: 10:18:06 Scheduled resource M290 on 9/30/2021 Starting 0 for 0.0 hours Ending 9/30/2021 Hour 0. --- processResourceID
1825: 10:18:06 Scheduling Resource M290 for job 055027 Operation 10 Priority 100 StartDate 9/30/2021 EndDate 9/30/2021. --- processResourceID
1826: 10:18:06 ******Done Scheduling Resource M290 for job 055027 Operation 10 Priority 100 StartDate 9/30/2021 EndDate 9/30/2021. --- processResourceID
1827: 10:18:06 ***Done Scheduling Resource M290 for job 055027 Operation 10 Priority 100 StartDate 9/30/2021 EndDate 9/30/2021 Move Date 9/30/2021. --- processResourceID
1828: 10:18:06 *First available time for Resource M290 is 9/30/2021 at 0 (0) ending on 9/30/2021 at 0 for 0 hours. Move Date 9/30/2021 Move Hour 0. --- processResourceID
1829: 10:18:06 Found time for M290 on 9/30/2021 0 ending 9/30/2021 0 Priority 1000 with Forward = _Forward. --- _SetPriority
1830: 10:18:06 **2Chose Resource - M290 Time: Queue 9/30/2021 - 0, Start 9/30/2021 - 0, End 9/30/2021 - 0, Move 9/30/2021 - 0. --- OpDtlFdProduction
1831 10:18:06 Checking if we should keep processing l_DateChanged False of Job: False l-OpMastSchedChange False l-TimeblockChange False iBeatCounter 0 --- Checkdatechange
1832 10:18:06 ****Created RTU for job 055027 Operation 10 with start date of 9/30/2021 and enddate of 9/30/2021 --- createTTResourceTimeUsed
1833: 10:18:06 Consolidating calendar with resource M290 --- OpDtlFdProduction
1834 10:18:06 -Forward Scheduling Job - 055027 Assem - 7 Operation - 10 Sequence - 10 - <S>etup/<P>roduction/<B>oth: B for a Setup time of 0.25 and Production Time of 0.50. --- OperationForward
2087 10:18:06 Capability efficiency for M-10001-THW primary operation detail. Time 0 --- processCapability
2088: 10:18:06 Processing Resource M290 --- processCapability
2089 10:18:06 Adjust Setup time by 1 to 0.0 --- GetTimeBlock
2090 10:18:06 Adjust ProdTime by 1 to 0 --- GetTimeBlock
2091: 10:18:06 ***Scheduling resource M290 for 0.0 hours --- processResourceID
2092 10:18:06 Queue Time is not calculated because: the first asm operation doesn't need queue time.. (runForwardResSched) --- runForwardResSched
2093: 10:18:06 Infinitely scheduling resource M290 FiniteHorizonDate 9/30/2021 ScheduleStartDate 9/30/2021 --- GetForwardDateTime
2094: 10:18:06 Scheduling resource M290 time: 9/30/2021 0 --- GetForwardDateTime
2095: 10:18:06 Looking for next scheduled time on resource M290 Starting from 9/30/2021 and a start hour of 0 --- GetForwardDateTime
2096: 10:18:06 Found end date and time for resource M290 to be 9/30/2021 0 --- GetForwardDateTime
2097: 10:18:06 Scheduled resource M290 on 9/30/2021 Starting 0 for 0.0 hours Ending 9/30/2021 Hour 0. --- processResourceID
2098: 10:18:06 Scheduling Resource M290 for job 055027 Operation 10 Priority 100 StartDate 9/30/2021 EndDate 9/30/2021. --- processResourceID
2099: 10:18:06 ******Done Scheduling Resource M290 for job 055027 Operation 10 Priority 100 StartDate 9/30/2021 EndDate 9/30/2021. --- processResourceID
2100: 10:18:06 ***Done Scheduling Resource M290 for job 055027 Operation 10 Priority 100 StartDate 9/30/2021 EndDate 9/30/2021 Move Date 9/30/2021. --- processResourceID
2101: 10:18:06 *First available time for Resource M290 is 9/30/2021 at 0 (0) ending on 9/30/2021 at 0 for 0 hours. Move Date 9/30/2021 Move Hour 0. --- processResourceID
2102: 10:18:06 Found time for M290 on 9/30/2021 0 ending 9/30/2021 0 Priority 1000 with Forward = _Forward. --- _SetPriority
2103: 10:18:06 **2Chose Resource - M290 Time: Queue 9/30/2021 - 0, Start 9/30/2021 - 0, End 9/30/2021 - 0, Move 9/30/2021 - 0. --- OpDtlFdProduction
2104 10:18:06 Checking if we should keep processing l_DateChanged False of Job: False l-OpMastSchedChange False l-TimeblockChange False iBeatCounter 0 --- Checkdatechange
2105 10:18:06 ****Created RTU for job 055027 Operation 10 with start date of 9/30/2021 and enddate of 9/30/2021 --- createTTResourceTimeUsed
2106: 10:18:06 Consolidating calendar with resource M290 --- OpDtlFdProduction
2107 10:18:06 -Forward Scheduling Job - 055027 Assem - 8 Operation - 10 Sequence - 10 - <S>etup/<P>roduction/<B>oth: B for a Setup time of 0.25 and Production Time of 0.33. --- OperationForward
5812 10:18:07 Capability efficiency for M-10001-THW primary operation detail. Time 0.33 --- processCapability
5813: 10:18:07 Processing Resource M290 --- processCapability
5814 10:18:07 Adjust Setup time by 1 to 0.15 --- GetTimeBlock
5815 10:18:07 Adjust ProdTime by 1 to 0.33 --- GetTimeBlock
5816: 10:18:07 ***Scheduling resource M290 for 0.48 hours --- processResourceID
5817: 10:18:07 Making production calendar for Resource M290 from production calendar MAIN. --- MakeConResCal
5818: 10:18:07 Making setup calendar MAIN for Resource: M290. --- MakeConResCal
5819 10:18:07 Queue Time is not calculated because: the first asm operation doesn't need queue time.. (runForwardResSched) --- runForwardResSched
5820: 10:18:07 Finitely scheduling resource M290 FiniteHorizonDate 3/29/2022 ScheduleStartDate 9/30/2021 --- GetForwardDateTime
5821: 10:18:07 Scheduling resource M290 time: 9/30/2021 0 --- GetForwardDateTime
5822: 10:18:07 1Looking for conflict on resource M290 on 9/30/2021 and a start hour of 0 (getForwardDateTime) --- GetForwardDateTime
5823: 10:18:07 **Found conflict for Resource M290 on Date 9/30/2021 and Start hour 0 with Job 055027 Assem 5 Operation 10 ( getForwardDateTime ) --- GetForwardDateTime
5824 10:18:07 Checking IP-ProcTime 23112 to be sure valid time - B --- GetNextGap
5825: 10:18:07 Now trying new time of Date 9/30/2021 Start Hour 6.42 for Resource M290 --- GetForwardDateTime
5826: 10:18:07 Now trying2 M290 time: 9/30/2021 6.42 --- GetForwardDateTime
5827: 10:18:07 Scheduling resource M290 time: 9/30/2021 6.42 --- GetForwardDateTime
5828: 10:18:07 1Looking for conflict on resource M290 on 9/30/2021 and a start hour of 6.42 (getForwardDateTime) --- GetForwardDateTime
5829: 10:18:07 No Conflict found for Resource M290 on Date: 9/30/2021 Time: 6.42 --- GetForwardDateTime
5830: 10:18:07 No Conflict found for Resource M290 on Date: 9/30/2021 Time: 6.42 End Date 9/30/2021 --- GetForwardDateTime
5831: 10:18:07 Checking for next scheduled time on resource M290 after 9/30/2021 is 6.42 hours. Looking for at least 6.42 hours. (findNextOpenTimeBlock) --- findNextOpenTimeBlock
5832: 10:18:07 Checking for conflict on resource M290 on 9/30/2021 where LocalResourceTimeUsed.StartTime >= 23112 . (findNextOpenTimeBlock) --- getNextRsrceOpenDateTime
5833 10:18:07 found CONFLICT with starttime for resource = False OP-StartDate 9/30/2021 FirstWorkingTime 23112 . (findNextOpenTimeBlock) --- getNextRsrceOpenDateTime
5834 10:18:07 2 found CONFLICT with starttime for resource = False OP-StartDate 9/30/2021 FirstWorkingTime 23112 . (findNextOpenTimeBlock) --- getNextRsrceOpenDateTime
5835: 10:18:07 Looking for next scheduled time on resource M290 Starting from 9/30/2021 and a start hour of 6.42 --- GetForwardDateTime
5836: 10:18:07 Found that resource M290 has 17 working hours on 9/30/2021. --- GetNextTotalAvailProdTime
5837 10:18:07 Calculated Endtime is 24840 --- GetNextTotalAvailProdTime
5838: 10:18:07 Found end date and time for resource M290 to be 9/30/2021 6.9 --- GetForwardDateTime
5839: 10:18:07 Scheduled resource M290 on 9/30/2021 Starting 23112 for 0.48 hours Ending 9/30/2021 Hour 6.9. --- processResourceID
5840: 10:18:07 Scheduling Resource M290 for job 055027 Operation 10 Priority 100 StartDate 9/30/2021 EndDate 9/30/2021. --- processResourceID
5841: 10:18:07 ******Done Scheduling Resource M290 for job 055027 Operation 10 Priority 100 StartDate 9/30/2021 EndDate 9/30/2021. --- processResourceID
5842: 10:18:07 ***Done Scheduling Resource M290 for job 055027 Operation 10 Priority 100 StartDate 9/30/2021 EndDate 9/30/2021 Move Date 9/30/2021. --- processResourceID
5843: 10:18:07 *First available time for Resource M290 is 9/30/2021 at 23112 (6.42) ending on 9/30/2021 at 6.9 for 0.48 hours. Move Date 9/30/2021 Move Hour 6.9. --- processResourceID
5844: 10:18:07 Found time for M290 on 9/30/2021 23112 ending 9/30/2021 24840 Priority 1000 with Forward = _Forward. --- _SetPriority
5845: 10:18:07 **2Chose Resource - M290 Time: Queue 9/30/2021 - 6.42, Start 9/30/2021 - 23112, End 9/30/2021 - 24840, Move 9/30/2021 - 6.9. --- OpDtlFdProduction
5846 10:18:07 Checking if we should keep processing l_DateChanged False of Job: False l-OpMastSchedChange False l-TimeblockChange False iBeatCounter 0 --- Checkdatechange
5847 10:18:07 ****Created RTU for job 055027 Operation 10 with start date of 9/30/2021 and enddate of 9/30/2021 --- createTTResourceTimeUsed
5848: 10:18:07 Consolidating calendar with resource M290 --- OpDtlFdProduction
5849: 10:18:07 Consolidated Operation Calendar with Resource Calendar: M290 --- Consolcals
5850 10:18:07 ttopmastcal - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x- - - - - - - -x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x- - - - - - - -x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x- - - - - - - -x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x- - - - - - - -x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x- - - - - - - - - - - - - - - - - - - - - - - - - - --- Consolcals
5851 10:18:07 ttopmasOrig True x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x- --- Consolcals
5852: 10:18:07 Consolidated Operation Calendar with Resource Calendar: M290 --- Consolcals
5853 10:18:07 ttopmastcal - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x- - - - - - - -x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x- - - - - - - -x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x- - - - - - - -x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x- - - - - - - -x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x- - - - - - - - - - - - - - - - - - - - - - - - - - --- Consolcals
10187 10:18:07 Capability efficiency for M-10001-THW primary operation detail. Time 0 --- processCapability
10188: 10:18:07 Processing Resource M290 --- processCapability
10189 10:18:07 Adjust Setup time by 1 to 0.0 --- GetTimeBlock
10190 10:18:07 Adjust ProdTime by 1 to 0 --- GetTimeBlock
10191: 10:18:07 ***Scheduling resource M290 for 0.0 hours --- processResourceID
10192: 10:18:07 Backward Scheduling M290 for 0.0 hours on 10/1/2021 with a EndTime of 20.31 IP-ProcTime 20.31. --- processResourceID
10193: 10:18:07 Infinitely scheduling M290 FiniteHorizonDate 9/30/2021 ScheduleDate 10/1/2021 --- GetBackwardDateTime
10194 10:18:07 Found 10/1/2021 as a valid working date IP-ProcTime = 73116 --- GetBackwardDateTime
10195 10:18:07 Found 10/1/2021 as a valid working date --- GetBackwardDateTime
10196: 10:18:07 Scheduling resource M290 starting at time: 10/1/2021 20.31 (getBackwardDateTime) --- GetBackwardDateTime
10197: 10:18:07 Scheduling resource M290 for : ScheduleDate 10/1/2021 FirstProdHour 0 LastProdHour 20.31 (getBackwardDateTime) --- GetBackwardDateTime
10198: 10:18:07 Looking for previous scheduled time on resource M290 before 10/1/2021 and a start hour of 20.31 --- GetBackwardDateTime
10199 10:18:07 Looking to Schedule 0.0 Hours Ending on 10/1/2021 and an end hour of 20.31 (getPrevTotalAvailProdTime) --- GetPrevTotalAvailProdTime
10200 10:18:07 Zero hours to schedule setting Start date to Start time to 0 (getPrevTotalAvailProdTime) --- GetPrevTotalAvailProdTime
10201: 10:18:07 Scheduled start time for resource M290 for 10/1/2021 and a start hour of 20.31 --- GetBackwardDateTime
10202: 10:18:07 Scheduling Resource M290 for job 055027 Operation 10 Priority 100 StartDate 10/1/2021 EndDate 10/1/2021. --- processResourceID
10203: 10:18:07 ******Done Scheduling Resource M290 for job 055027 Operation 10 Priority 100 StartDate 10/1/2021 EndDate 10/1/2021. --- processResourceID
10204: 10:18:07 ***Done Scheduling Resource M290 for job 055027 Operation 10 Priority 100 StartDate 10/1/2021 EndDate 10/1/2021 Move Date 10/1/2021. --- processResourceID
10205: 10:18:07 *First available time for Resource M290 is 10/1/2021 at 73116 (20.31) ending on 10/1/2021 at 20.31 for 0 hours. Move Date 10/1/2021 Move Hour 20.31. --- processResourceID
10206: 10:18:07 Found time for M290 on 10/1/2021 73116 ending 10/1/2021 73116 Priority 1000 with Forward = _Forward. --- _SetPriority
10207: 10:18:07 **Chose Resource - M290 Time: SDt 10/1/2021, STime 20.31, End Dt 10/1/2021, End Time 20.31 Move Dt 10/1/2021 Move Hr 20.31 . --- OpDtlBkProduction
10208 10:18:07 ****Created RTU for job 055027 Operation 10 with start date of 10/1/2021 and enddate of 10/1/2021 --- createTTResourceTimeUsed
10209: 10:18:07 Consolidating calendar with resource M290 --- OpDtlBkProduction
10210 10:18:07 Backward Scheduling - Job 055027 Asm 2 Opr 10 OpDtl 10 AllocationBlock - 1 For: Enddate - 10/1/2021 EndHour - 20.31 Endtime 1 tmpendtime 595412.31. --- OpDtlBkProduction
10490 10:18:07 Capability efficiency for M-10001-THW primary operation detail. Time 0 --- processCapability
10491: 10:18:07 Processing Resource M290 --- processCapability
10492 10:18:07 Adjust Setup time by 1 to 0.0 --- GetTimeBlock
10493 10:18:07 Adjust ProdTime by 1 to 0 --- GetTimeBlock
10494: 10:18:07 ***Scheduling resource M290 for 0.0 hours --- processResourceID
10495: 10:18:07 Backward Scheduling M290 for 0.0 hours on 10/1/2021 with a EndTime of 20.31 IP-ProcTime 20.31. --- processResourceID
10496: 10:18:07 Infinitely scheduling M290 FiniteHorizonDate 9/30/2021 ScheduleDate 10/1/2021 --- GetBackwardDateTime
10497 10:18:07 Found 10/1/2021 as a valid working date IP-ProcTime = 73116 --- GetBackwardDateTime
10498 10:18:07 Found 10/1/2021 as a valid working date --- GetBackwardDateTime
10499: 10:18:07 Scheduling resource M290 starting at time: 10/1/2021 20.31 (getBackwardDateTime) --- GetBackwardDateTime
10500: 10:18:07 Scheduling resource M290 for : ScheduleDate 10/1/2021 FirstProdHour 0 LastProdHour 20.31 (getBackwardDateTime) --- GetBackwardDateTime
10501: 10:18:07 Looking for previous scheduled time on resource M290 before 10/1/2021 and a start hour of 20.31 --- GetBackwardDateTime
10502 10:18:07 Looking to Schedule 0.0 Hours Ending on 10/1/2021 and an end hour of 20.31 (getPrevTotalAvailProdTime) --- GetPrevTotalAvailProdTime
10503 10:18:07 Zero hours to schedule setting Start date to Start time to 0 (getPrevTotalAvailProdTime) --- GetPrevTotalAvailProdTime
10504: 10:18:07 Scheduled start time for resource M290 for 10/1/2021 and a start hour of 20.31 --- GetBackwardDateTime
10505: 10:18:07 Scheduling Resource M290 for job 055027 Operation 10 Priority 100 StartDate 10/1/2021 EndDate 10/1/2021. --- processResourceID
10506: 10:18:07 ******Done Scheduling Resource M290 for job 055027 Operation 10 Priority 100 StartDate 10/1/2021 EndDate 10/1/2021. --- processResourceID
10507: 10:18:07 ***Done Scheduling Resource M290 for job 055027 Operation 10 Priority 100 StartDate 10/1/2021 EndDate 10/1/2021 Move Date 10/1/2021. --- processResourceID
10508: 10:18:07 *First available time for Resource M290 is 10/1/2021 at 73116 (20.31) ending on 10/1/2021 at 20.31 for 0 hours. Move Date 10/1/2021 Move Hour 20.31. --- processResourceID
10509: 10:18:07 Found time for M290 on 10/1/2021 73116 ending 10/1/2021 73116 Priority 1000 with Forward = _Forward. --- _SetPriority
10510: 10:18:07 **Chose Resource - M290 Time: SDt 10/1/2021, STime 20.31, End Dt 10/1/2021, End Time 20.31 Move Dt 10/1/2021 Move Hr 20.31 . --- OpDtlBkProduction
10511 10:18:07 ****Created RTU for job 055027 Operation 10 with start date of 10/1/2021 and enddate of 10/1/2021 --- createTTResourceTimeUsed
10512: 10:18:07 Consolidating calendar with resource M290 --- OpDtlBkProduction
10513 10:18:07 Backward Scheduling - Job 055027 Asm 3 Opr 10 OpDtl 10 AllocationBlock - 1 For: Enddate - 10/1/2021 EndHour - 20.31 Endtime 1 tmpendtime 595412.31. --- OpDtlBkProduction
10793 10:18:07 Capability efficiency for M-10001-THW primary operation detail. Time 0 --- processCapability
10794: 10:18:07 Processing Resource M290 --- processCapability
10795 10:18:07 Adjust Setup time by 1 to 0.0 --- GetTimeBlock
10796 10:18:07 Adjust ProdTime by 1 to 0 --- GetTimeBlock
10797: 10:18:07 ***Scheduling resource M290 for 0.0 hours --- processResourceID
10798: 10:18:07 Backward Scheduling M290 for 0.0 hours on 10/1/2021 with a EndTime of 20.31 IP-ProcTime 20.31. --- processResourceID
10799: 10:18:07 Infinitely scheduling M290 FiniteHorizonDate 9/30/2021 ScheduleDate 10/1/2021 --- GetBackwardDateTime
10800 10:18:07 Found 10/1/2021 as a valid working date IP-ProcTime = 73116 --- GetBackwardDateTime
10801 10:18:07 Found 10/1/2021 as a valid working date --- GetBackwardDateTime
10802: 10:18:07 Scheduling resource M290 starting at time: 10/1/2021 20.31 (getBackwardDateTime) --- GetBackwardDateTime
10803: 10:18:07 Scheduling resource M290 for : ScheduleDate 10/1/2021 FirstProdHour 0 LastProdHour 20.31 (getBackwardDateTime) --- GetBackwardDateTime
10804: 10:18:07 Looking for previous scheduled time on resource M290 before 10/1/2021 and a start hour of 20.31 --- GetBackwardDateTime
10805 10:18:07 Looking to Schedule 0.0 Hours Ending on 10/1/2021 and an end hour of 20.31 (getPrevTotalAvailProdTime) --- GetPrevTotalAvailProdTime
10806 10:18:07 Zero hours to schedule setting Start date to Start time to 0 (getPrevTotalAvailProdTime) --- GetPrevTotalAvailProdTime
10807: 10:18:07 Scheduled start time for resource M290 for 10/1/2021 and a start hour of 20.31 --- GetBackwardDateTime
10808: 10:18:07 Scheduling Resource M290 for job 055027 Operation 10 Priority 100 StartDate 10/1/2021 EndDate 10/1/2021. --- processResourceID
10809: 10:18:07 ******Done Scheduling Resource M290 for job 055027 Operation 10 Priority 100 StartDate 10/1/2021 EndDate 10/1/2021. --- processResourceID
10810: 10:18:07 ***Done Scheduling Resource M290 for job 055027 Operation 10 Priority 100 StartDate 10/1/2021 EndDate 10/1/2021 Move Date 10/1/2021. --- processResourceID
10811: 10:18:07 *First available time for Resource M290 is 10/1/2021 at 73116 (20.31) ending on 10/1/2021 at 20.31 for 0 hours. Move Date 10/1/2021 Move Hour 20.31. --- processResourceID
10812: 10:18:07 Found time for M290 on 10/1/2021 73116 ending 10/1/2021 73116 Priority 1000 with Forward = _Forward. --- _SetPriority
10813: 10:18:07 **Chose Resource - M290 Time: SDt 10/1/2021, STime 20.31, End Dt 10/1/2021, End Time 20.31 Move Dt 10/1/2021 Move Hr 20.31 . --- OpDtlBkProduction
10814 10:18:07 ****Created RTU for job 055027 Operation 10 with start date of 10/1/2021 and enddate of 10/1/2021 --- createTTResourceTimeUsed
10815: 10:18:07 Consolidating calendar with resource M290 --- OpDtlBkProduction
10816 10:18:07 Backward Scheduling - Job 055027 Asm 4 Opr 10 OpDtl 10 AllocationBlock - 1 For: Enddate - 10/1/2021 EndHour - 20.31 Endtime 1 tmpendtime 595412.31. --- OpDtlBkProduction
11096 10:18:07 Capability efficiency for M-10001-THW primary operation detail. Time 0.16667 --- processCapability
11097: 10:18:07 Processing Resource M290 --- processCapability
11098 10:18:07 Adjust Setup time by 1 to 0.25 --- GetTimeBlock
11099 10:18:07 Adjust ProdTime by 1 to 0.16667 --- GetTimeBlock
11100: 10:18:07 ***Scheduling resource M290 for 0.41667 hours --- processResourceID
11101: 10:18:07 Making production calendar for Resource M290 from production calendar MAIN. --- MakeConResCal
11102: 10:18:07 Making setup calendar MAIN for Resource: M290. --- MakeConResCal
11103: 10:18:07 Backward Scheduling M290 for 0.41667 hours on 10/1/2021 with a EndTime of 20.31 IP-ProcTime 20.31. --- processResourceID
11104: 10:18:07 Finitely scheduling M290 FiniteHorizonDate 3/29/2022 ScheduleDate 10/1/2021 --- GetBackwardDateTime
11105 10:18:07 Found 10/1/2021 as a valid working date IP-ProcTime = 73116 --- GetBackwardDateTime
11106 10:18:07 Found 10/1/2021 as a valid working date --- GetBackwardDateTime
11107: 10:18:07 Scheduling resource M290 starting at time: 10/1/2021 20.31 (getBackwardDateTime) --- GetBackwardDateTime
11108: 10:18:07 Scheduling resource M290 for : ScheduleDate 10/1/2021 FirstProdHour 6 LastProdHour 20.31 (getBackwardDateTime) --- GetBackwardDateTime
11109: 10:18:07 2Looking for previous scheduled time on resource M290 before 9/30/2021 12:00:00 AM and a start hour of 20.31 --- GetBackwardDateTime
11110: 10:18:07 Finitely scheduling Resource M290 on Date 10/1/2021 with a Finite Horizon Date of 3/29/2022 12:00:00 AM (getBackwardDateTime) --- GetBackwardDateTime
11111: 10:18:07 Looking for conflict on resource M290 on 10/1/2021 and a start hour of 20.31 (getBackwardDateTime) --- GetBackwardDateTime
11112: 10:18:07 No conflict found for Resource M290 on Date 10/1/2021 and Start hour 20.31 (getBackwardDateTime) --- GetBackwardDateTime
11113: 10:18:07 Last production hour for Resource M290 on Date 10/1/2021 is hour 20.31 (getBackwardDateTime) --- GetBackwardDateTime
11114: 10:18:07 Same start time with Resource M290 on Date 10/1/2021 and Start hour 20.31 (getBackwardDateTime) --- GetBackwardDateTime
11115 10:18:07 Start time and end time of operation equal. Retrying again 1 times (getBackwardDateTime) --- GetBackwardDateTime
11116: 10:18:07 Looking for time scheduled on resource M290 before : ScheduleDate 10/1/2021 Hour 20.31 (getBackwardDateTime) --- GetBackwardDateTime
11117: 10:18:07 Checking for a operation on M290 scheduled before 10/1/2021 20.31 --- findPrevOpenTimeBlock
11118 10:18:07 RETURNING3 Op-TotalTime 0 Starting 10/1/2021 0 and ending 10/1/2021 0 --- getPrevRsrceOpenDateTime
11119: 10:18:07 Found the next (previous) operation scheduled for M290 is from 10/1/2021 0 to 10/1/2021 0 --- findPrevOpenTimeBlock
11120: 10:18:07 Looking for previous scheduled time on resource M290 before 10/1/2021 and a start hour of 20.31 --- GetBackwardDateTime
11121 10:18:07 Looking to Schedule 0.42 Hours Ending on 10/1/2021 and an end hour of 20.31 (getPrevTotalAvailProdTime) --- GetPrevTotalAvailProdTime
11122: 10:18:07 Found that resource M290 has 17 working hours on 10/1/2021. --- GetPrevTotalAvailProdTime
11123 10:18:07 Looking to Schedule 2 Hours Ending on 10/1/2021 and an end hour of 21 (getPrevTotalAvailProdTime) --- GetPrevTotalAvailProdTime
11124: 10:18:07 Found that resource M290 has 17 working hours on 10/1/2021. --- GetPrevTotalAvailProdTime
11125 10:18:07 Looking to Schedule 2 Hours Ending on 10/1/2021 and an end hour of 21 (getPrevTotalAvailProdTime) --- GetPrevTotalAvailProdTime
11126 10:18:07 ****5 OP-StartTime 71604 --- GetPrevTotalAvailProdTime
11127: 10:18:07 Scheduled start time for resource M290 for 10/1/2021 and a start hour of 19.89 --- GetBackwardDateTime
11128: 10:18:07 Check for Conflict on resource2 M290 for 10/1/2021 and a start hour of 20.31 OP-ZeroHourStartTime 595411.89 (getBackwardDateTime) --- GetBackwardDateTime
11129: 10:18:07 Check for Conflict on resource3 M290 for 10/1/2021 and a start hour of 20.31 OP-ZeroHourStartTime 595411.89 (getBackwardDateTime2) --- GetBackwardDateTime
11130: 10:18:07 NO Conflict on resource2 M290 for 10/1/2021 and a start hour of 19.89 OP-ZeroHourStartTime 595411.89 (getBackwardDateTime) --- GetBackwardDateTime
11131: 10:18:07 Scheduling Resource M290 for job 055027 Operation 10 Priority 100 StartDate 10/1/2021 EndDate 10/1/2021. --- processResourceID
11132: 10:18:07 ******Done Scheduling Resource M290 for job 055027 Operation 10 Priority 100 StartDate 10/1/2021 EndDate 10/1/2021. --- processResourceID
11133: 10:18:07 ***Done Scheduling Resource M290 for job 055027 Operation 10 Priority 100 StartDate 10/1/2021 EndDate 10/1/2021 Move Date 10/1/2021. --- processResourceID
11134: 10:18:07 *First available time for Resource M290 is 10/1/2021 at 71604 (19.89) ending on 10/1/2021 at 20.31 for 0.4166666666666666666666666667 hours. Move Date 10/1/2021 Move Hour 20.31. --- processResourceID
11135: 10:18:07 Found time for M290 on 10/1/2021 71604 ending 10/1/2021 73116 Priority 1000 with Forward = _Forward. --- _SetPriority
11136: 10:18:07 **Chose Resource - M290 Time: SDt 10/1/2021, STime 19.89, End Dt 10/1/2021, End Time 20.31 Move Dt 10/1/2021 Move Hr 20.31 . --- OpDtlBkProduction
11137 10:18:07 ****Created RTU for job 055027 Operation 10 with start date of 10/1/2021 and enddate of 10/1/2021 --- createTTResourceTimeUsed
11138: 10:18:07 Consolidating calendar with resource M290 --- OpDtlBkProduction
11139: 10:18:07 Consolidated Operation Calendar with Resource Calendar: M290 --- Consolcals
11140 10:18:07 ttopmastcal - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x- - - - - - - -x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x- - - - - - - -x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x- - - - - - - -x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x- - - - - - - -x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x- - - - - - - - - - - - - - - - - - - - - - - - - - --- Consolcals
11141 10:18:07 ttopmasOrig True x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x- --- Consolcals
11142: 10:18:07 Consolidated Operation Calendar with Resource Calendar: M290 --- Consolcals
11143 10:18:07 ttopmastcal - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x- - - - - - - -x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x- - - - - - - -x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x- - - - - - - -x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x- - - - - - - -x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x- - - - - - - - - - - - - - - - - - - - - - - - - - --- Consolcals
11450 10:18:07 Capability efficiency for M-10001-THW primary operation detail. Time 0 --- processCapability
11451: 10:18:07 Processing Resource M290 --- processCapability
11452 10:18:07 Adjust Setup time by 1 to 0.0 --- GetTimeBlock
11453 10:18:07 Adjust ProdTime by 1 to 0 --- GetTimeBlock
11454: 10:18:07 ***Scheduling resource M290 for 0.0 hours --- processResourceID
11455: 10:18:07 Backward Scheduling M290 for 0.0 hours on 10/1/2021 with a EndTime of 20.31 IP-ProcTime 20.31. --- processResourceID
11456: 10:18:07 Infinitely scheduling M290 FiniteHorizonDate 9/30/2021 ScheduleDate 10/1/2021 --- GetBackwardDateTime
11457 10:18:07 Found 10/1/2021 as a valid working date IP-ProcTime = 73116 --- GetBackwardDateTime
11458 10:18:07 Found 10/1/2021 as a valid working date --- GetBackwardDateTime
11459: 10:18:07 Scheduling resource M290 starting at time: 10/1/2021 20.31 (getBackwardDateTime) --- GetBackwardDateTime
11460: 10:18:07 Scheduling resource M290 for : ScheduleDate 10/1/2021 FirstProdHour 0 LastProdHour 20.31 (getBackwardDateTime) --- GetBackwardDateTime
11461: 10:18:07 Looking for previous scheduled time on resource M290 before 10/1/2021 and a start hour of 20.31 --- GetBackwardDateTime
11462 10:18:07 Looking to Schedule 0.0 Hours Ending on 10/1/2021 and an end hour of 20.31 (getPrevTotalAvailProdTime) --- GetPrevTotalAvailProdTime
11463 10:18:07 Zero hours to schedule setting Start date to Start time to 0 (getPrevTotalAvailProdTime) --- GetPrevTotalAvailProdTime
11464: 10:18:07 Scheduled start time for resource M290 for 10/1/2021 and a start hour of 20.31 --- GetBackwardDateTime
11465: 10:18:07 Scheduling Resource M290 for job 055027 Operation 10 Priority 100 StartDate 10/1/2021 EndDate 10/1/2021. --- processResourceID
11466: 10:18:07 ******Done Scheduling Resource M290 for job 055027 Operation 10 Priority 100 StartDate 10/1/2021 EndDate 10/1/2021. --- processResourceID
11467: 10:18:07 ***Done Scheduling Resource M290 for job 055027 Operation 10 Priority 100 StartDate 10/1/2021 EndDate 10/1/2021 Move Date 10/1/2021. --- processResourceID
11468: 10:18:07 *First available time for Resource M290 is 10/1/2021 at 73116 (20.31) ending on 10/1/2021 at 20.31 for 0 hours. Move Date 10/1/2021 Move Hour 20.31. --- processResourceID
11469: 10:18:07 Found time for M290 on 10/1/2021 73116 ending 10/1/2021 73116 Priority 1000 with Forward = _Forward. --- _SetPriority
11470: 10:18:07 **Chose Resource - M290 Time: SDt 10/1/2021, STime 20.31, End Dt 10/1/2021, End Time 20.31 Move Dt 10/1/2021 Move Hr 20.31 . --- OpDtlBkProduction
11471 10:18:07 ****Created RTU for job 055027 Operation 10 with start date of 10/1/2021 and enddate of 10/1/2021 --- createTTResourceTimeUsed
11472: 10:18:07 Consolidating calendar with resource M290 --- OpDtlBkProduction
11473 10:18:07 Backward Scheduling - Job 055027 Asm 6 Opr 10 OpDtl 10 AllocationBlock - 1 For: Enddate - 10/1/2021 EndHour - 20.31 Endtime 1 tmpendtime 595412.31. --- OpDtlBkProduction
11753 10:18:07 Capability efficiency for M-10001-THW primary operation detail. Time 0 --- processCapability
11754: 10:18:07 Processing Resource M290 --- processCapability
11755 10:18:07 Adjust Setup time by 1 to 0.0 --- GetTimeBlock
11756 10:18:07 Adjust ProdTime by 1 to 0 --- GetTimeBlock
11757: 10:18:07 ***Scheduling resource M290 for 0.0 hours --- processResourceID
11758: 10:18:07 Backward Scheduling M290 for 0.0 hours on 10/1/2021 with a EndTime of 20.31 IP-ProcTime 20.31. --- processResourceID
11759: 10:18:07 Infinitely scheduling M290 FiniteHorizonDate 9/30/2021 ScheduleDate 10/1/2021 --- GetBackwardDateTime
11760 10:18:07 Found 10/1/2021 as a valid working date IP-ProcTime = 73116 --- GetBackwardDateTime
11761 10:18:07 Found 10/1/2021 as a valid working date --- GetBackwardDateTime
11762: 10:18:07 Scheduling resource M290 starting at time: 10/1/2021 20.31 (getBackwardDateTime) --- GetBackwardDateTime
11763: 10:18:07 Scheduling resource M290 for : ScheduleDate 10/1/2021 FirstProdHour 0 LastProdHour 20.31 (getBackwardDateTime) --- GetBackwardDateTime
11764: 10:18:07 Looking for previous scheduled time on resource M290 before 10/1/2021 and a start hour of 20.31 --- GetBackwardDateTime
11765 10:18:07 Looking to Schedule 0.0 Hours Ending on 10/1/2021 and an end hour of 20.31 (getPrevTotalAvailProdTime) --- GetPrevTotalAvailProdTime
11766 10:18:07 Zero hours to schedule setting Start date to Start time to 0 (getPrevTotalAvailProdTime) --- GetPrevTotalAvailProdTime
11767: 10:18:07 Scheduled start time for resource M290 for 10/1/2021 and a start hour of 20.31 --- GetBackwardDateTime
11768: 10:18:07 Scheduling Resource M290 for job 055027 Operation 10 Priority 100 StartDate 10/1/2021 EndDate 10/1/2021. --- processResourceID
11769: 10:18:07 ******Done Scheduling Resource M290 for job 055027 Operation 10 Priority 100 StartDate 10/1/2021 EndDate 10/1/2021. --- processResourceID
11770: 10:18:07 ***Done Scheduling Resource M290 for job 055027 Operation 10 Priority 100 StartDate 10/1/2021 EndDate 10/1/2021 Move Date 10/1/2021. --- processResourceID
11771: 10:18:07 *First available time for Resource M290 is 10/1/2021 at 73116 (20.31) ending on 10/1/2021 at 20.31 for 0 hours. Move Date 10/1/2021 Move Hour 20.31. --- processResourceID
11772: 10:18:07 Found time for M290 on 10/1/2021 73116 ending 10/1/2021 73116 Priority 1000 with Forward = _Forward. --- _SetPriority
11773: 10:18:07 **Chose Resource - M290 Time: SDt 10/1/2021, STime 20.31, End Dt 10/1/2021, End Time 20.31 Move Dt 10/1/2021 Move Hr 20.31 . --- OpDtlBkProduction
11774 10:18:07 ****Created RTU for job 055027 Operation 10 with start date of 10/1/2021 and enddate of 10/1/2021 --- createTTResourceTimeUsed
11775: 10:18:07 Consolidating calendar with resource M290 --- OpDtlBkProduction
11776 10:18:07 Backward Scheduling - Job 055027 Asm 7 Opr 10 OpDtl 10 AllocationBlock - 1 For: Enddate - 10/1/2021 EndHour - 20.31 Endtime 1 tmpendtime 595412.31. --- OpDtlBkProduction
11909 10:18:07 Capability efficiency for M-10001-THW primary operation detail. Time 0 --- processCapability
11910: 10:18:07 Processing Resource M290 --- processCapability
11911 10:18:07 Adjust Setup time by 1 to 0.0 --- GetTimeBlock
11912 10:18:07 Adjust ProdTime by 1 to 0 --- GetTimeBlock
11913: 10:18:07 ***Scheduling resource M290 for 0.0 hours --- processResourceID
11914: 10:18:07 Backward Scheduling M290 for 0.0 hours on 10/1/2021 with a EndTime of 20.31 IP-ProcTime 20.31. --- processResourceID
11915: 10:18:07 Infinitely scheduling M290 FiniteHorizonDate 9/30/2021 ScheduleDate 10/1/2021 --- GetBackwardDateTime
11916 10:18:07 Found 10/1/2021 as a valid working date IP-ProcTime = 73116 --- GetBackwardDateTime
11917 10:18:07 Found 10/1/2021 as a valid working date --- GetBackwardDateTime
11918: 10:18:07 Scheduling resource M290 starting at time: 10/1/2021 20.31 (getBackwardDateTime) --- GetBackwardDateTime
11919: 10:18:07 Scheduling resource M290 for : ScheduleDate 10/1/2021 FirstProdHour 0 LastProdHour 20.31 (getBackwardDateTime) --- GetBackwardDateTime
11920: 10:18:07 Looking for previous scheduled time on resource M290 before 10/1/2021 and a start hour of 20.31 --- GetBackwardDateTime
11921 10:18:07 Looking to Schedule 0.0 Hours Ending on 10/1/2021 and an end hour of 20.31 (getPrevTotalAvailProdTime) --- GetPrevTotalAvailProdTime
11922 10:18:07 Zero hours to schedule setting Start date to Start time to 0 (getPrevTotalAvailProdTime) --- GetPrevTotalAvailProdTime
11923: 10:18:07 Scheduled start time for resource M290 for 10/1/2021 and a start hour of 20.31 --- GetBackwardDateTime
11924: 10:18:07 Scheduling Resource M290 for job 055027 Operation 10 Priority 100 StartDate 10/1/2021 EndDate 10/1/2021. --- processResourceID
11925: 10:18:07 ******Done Scheduling Resource M290 for job 055027 Operation 10 Priority 100 StartDate 10/1/2021 EndDate 10/1/2021. --- processResourceID
11926: 10:18:07 ***Done Scheduling Resource M290 for job 055027 Operation 10 Priority 100 StartDate 10/1/2021 EndDate 10/1/2021 Move Date 10/1/2021. --- processResourceID
11927: 10:18:07 *First available time for Resource M290 is 10/1/2021 at 73116 (20.31) ending on 10/1/2021 at 20.31 for 0 hours. Move Date 10/1/2021 Move Hour 20.31. --- processResourceID
11928: 10:18:07 Found time for M290 on 10/1/2021 73116 ending 10/1/2021 73116 Priority 1000 with Forward = _Forward. --- _SetPriority
11929: 10:18:07 **Chose Resource - M290 Time: SDt 10/1/2021, STime 20.31, End Dt 10/1/2021, End Time 20.31 Move Dt 10/1/2021 Move Hr 20.31 . --- OpDtlBkProduction
11930 10:18:07 ****Created RTU for job 055027 Operation 10 with start date of 10/1/2021 and enddate of 10/1/2021 --- createTTResourceTimeUsed
11931: 10:18:07 Consolidating calendar with resource M290 --- OpDtlBkProduction
11932 10:18:07 Backward Scheduling - Job 055027 Asm 8 Opr 10 OpDtl 10 AllocationBlock - 1 For: Enddate - 10/1/2021 EndHour - 20.31 Endtime 1 tmpendtime 595412.31. --- OpDtlBkProduction
16407 10:18:08 Capability efficiency for M-10001-THW primary operation detail. Time 0.33 --- processCapability
16408: 10:18:08 Processing Resource M290 --- processCapability
16409 10:18:08 Adjust Setup time by 1 to 0.15 --- GetTimeBlock
16410 10:18:08 Adjust ProdTime by 1 to 0.33 --- GetTimeBlock
16411: 10:18:08 ***Scheduling resource M290 for 0.48 hours --- processResourceID
16412: 10:18:08 Making production calendar for Resource M290 from production calendar MAIN. --- MakeConResCal
16413: 10:18:08 Making setup calendar MAIN for Resource: M290. --- MakeConResCal
16414: 10:18:08 Backward Scheduling M290 for 0.48 hours on 10/1/2021 with a EndTime of 19.31 IP-ProcTime 19.31. --- processResourceID
16415: 10:18:08 Finitely scheduling M290 FiniteHorizonDate 3/29/2022 ScheduleDate 10/1/2021 --- GetBackwardDateTime
16416 10:18:08 Found 10/1/2021 as a valid working date IP-ProcTime = 69516 --- GetBackwardDateTime
16417 10:18:08 Found 10/1/2021 as a valid working date --- GetBackwardDateTime
16418: 10:18:08 Scheduling resource M290 starting at time: 10/1/2021 19.31 (getBackwardDateTime) --- GetBackwardDateTime
16419: 10:18:08 Scheduling resource M290 for : ScheduleDate 10/1/2021 FirstProdHour 6 LastProdHour 19.31 (getBackwardDateTime) --- GetBackwardDateTime
16420: 10:18:08 2Looking for previous scheduled time on resource M290 before 9/30/2021 12:00:00 AM and a start hour of 19.31 --- GetBackwardDateTime
16421: 10:18:08 Finitely scheduling Resource M290 on Date 10/1/2021 with a Finite Horizon Date of 3/29/2022 12:00:00 AM (getBackwardDateTime) --- GetBackwardDateTime
16422: 10:18:08 Looking for conflict on resource M290 on 10/1/2021 and a start hour of 19.31 (getBackwardDateTime) --- GetBackwardDateTime
16423: 10:18:08 No conflict found for Resource M290 on Date 10/1/2021 and Start hour 19.31 (getBackwardDateTime) --- GetBackwardDateTime
16424: 10:18:08 Last production hour for Resource M290 on Date 10/1/2021 is hour 19.31 (getBackwardDateTime) --- GetBackwardDateTime
16425: 10:18:08 Looking for time scheduled on resource M290 before : ScheduleDate 10/1/2021 Hour 19.31 (getBackwardDateTime) --- GetBackwardDateTime
16426: 10:18:08 Checking for a operation on M290 scheduled before 10/1/2021 19.31 --- findPrevOpenTimeBlock
16427 10:18:08 RETURNING3 Op-TotalTime 0 Starting 10/1/2021 0 and ending 10/1/2021 0 --- getPrevRsrceOpenDateTime
16428: 10:18:08 Found the next (previous) operation scheduled for M290 is from 10/1/2021 0 to 10/1/2021 0 --- findPrevOpenTimeBlock
16429: 10:18:08 Looking for previous scheduled time on resource M290 before 10/1/2021 and a start hour of 19.31 --- GetBackwardDateTime
16430 10:18:08 Looking to Schedule 0.48 Hours Ending on 10/1/2021 and an end hour of 19.31 (getPrevTotalAvailProdTime) --- GetPrevTotalAvailProdTime
16431: 10:18:08 Found that resource M290 has 17 working hours on 10/1/2021. --- GetPrevTotalAvailProdTime
16432 10:18:08 Looking to Schedule 2 Hours Ending on 10/1/2021 and an end hour of 20 (getPrevTotalAvailProdTime) --- GetPrevTotalAvailProdTime
16433: 10:18:08 Found that resource M290 has 17 working hours on 10/1/2021. --- GetPrevTotalAvailProdTime
16434 10:18:08 Looking to Schedule 2 Hours Ending on 10/1/2021 and an end hour of 20 (getPrevTotalAvailProdTime) --- GetPrevTotalAvailProdTime
16435 10:18:08 ****5 OP-StartTime 67788 --- GetPrevTotalAvailProdTime
16436: 10:18:08 Scheduled start time for resource M290 for 10/1/2021 and a start hour of 18.83 --- GetBackwardDateTime
16437: 10:18:08 Check for Conflict on resource2 M290 for 10/1/2021 and a start hour of 19.31 OP-ZeroHourStartTime 595410.83 (getBackwardDateTime) --- GetBackwardDateTime
16438: 10:18:08 Check for Conflict on resource3 M290 for 10/1/2021 and a start hour of 19.31 OP-ZeroHourStartTime 595410.83 (getBackwardDateTime2) --- GetBackwardDateTime
16439: 10:18:08 NO Conflict on resource2 M290 for 10/1/2021 and a start hour of 18.83 OP-ZeroHourStartTime 595410.83 (getBackwardDateTime) --- GetBackwardDateTime
16440: 10:18:08 Scheduling Resource M290 for job 055027 Operation 10 Priority 100 StartDate 10/1/2021 EndDate 10/1/2021. --- processResourceID
16441: 10:18:08 ******Done Scheduling Resource M290 for job 055027 Operation 10 Priority 100 StartDate 10/1/2021 EndDate 10/1/2021. --- processResourceID
16442: 10:18:08 ***Done Scheduling Resource M290 for job 055027 Operation 10 Priority 100 StartDate 10/1/2021 EndDate 10/1/2021 Move Date 10/1/2021. --- processResourceID
16443: 10:18:08 *First available time for Resource M290 is 10/1/2021 at 67788 (18.83) ending on 10/1/2021 at 19.31 for 0.48 hours. Move Date 10/1/2021 Move Hour 19.31. --- processResourceID
16444: 10:18:08 Found time for M290 on 10/1/2021 67788 ending 10/1/2021 69516 Priority 1000 with Forward = _Forward. --- _SetPriority
16445: 10:18:08 **Chose Resource - M290 Time: SDt 10/1/2021, STime 18.83, End Dt 10/1/2021, End Time 19.31 Move Dt 10/1/2021 Move Hr 19.31 . --- OpDtlBkProduction
16446 10:18:08 Checking purchase direct material constraint for operation 10 material CBS-64711804-30002500000000000-144000-0 . --- Check_Mtl_LeadTimes
16448 10:18:08 ****Created RTU for job 055027 Operation 10 with start date of 10/1/2021 and enddate of 10/1/2021 --- createTTResourceTimeUsed
16449: 10:18:08 Consolidating calendar with resource M290 --- OpDtlBkProduction
16450: 10:18:08 Consolidated Operation Calendar with Resource Calendar: M290 --- Consolcals
16451 10:18:08 ttopmastcal - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x- - - - - - - -x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x- - - - - - - -x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x- - - - - - - -x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x- - - - - - - -x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x- - - - - - - - - - - - - - - - - - - - - - - - - - --- Consolcals
16452 10:18:08 ttopmasOrig True x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x- --- Consolcals
16453: 10:18:08 Consolidated Operation Calendar with Resource Calendar: M290 --- Consolcals
16454 10:18:08 ttopmastcal - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x- - - - - - - -x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x- - - - - - - -x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x- - - - - - - -x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x- - - - - - - -x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x- - - - - - - - - - - - - - - - - - - - - - - - - - --- Consolcals
19321 10:18:08 Rough cut scheduling 055027 False. Job start date 10/1/2021 Rough cut date 3/29/2022. --- CommitJob
19322: 10:18:08 Create RTU for Job 055027 Asmbl 2 Sequence 10 OpDtl 20 Whatif True. Resource M290 Start date: 10/1/2021, Start time: 73116, End Date: 10/1/2021, End time: 73116 --- CommitJob
19323 10:18:08 about apply whatif load : False --- CommitJob
19367 10:18:08 Rough cut scheduling 055027 False. Job start date 10/1/2021 Rough cut date 3/29/2022. --- CommitJob
19368: 10:18:08 Create RTU for Job 055027 Asmbl 3 Sequence 10 OpDtl 20 Whatif True. Resource M290 Start date: 10/1/2021, Start time: 73116, End Date: 10/1/2021, End time: 73116 --- CommitJob
19369 10:18:08 about apply whatif load : False --- CommitJob
19412 10:18:09 Rough cut scheduling 055027 False. Job start date 10/1/2021 Rough cut date 3/29/2022. --- CommitJob
19413: 10:18:09 Create RTU for Job 055027 Asmbl 4 Sequence 10 OpDtl 20 Whatif True. Resource M290 Start date: 10/1/2021, Start time: 73116, End Date: 10/1/2021, End time: 73116 --- CommitJob
19414 10:18:09 about apply whatif load : False --- CommitJob
19457 10:18:09 Rough cut scheduling 055027 False. Job start date 10/1/2021 Rough cut date 3/29/2022. --- CommitJob
19458: 10:18:09 Create RTU for Job 055027 Asmbl 5 Sequence 10 OpDtl 20 Whatif True. Resource M290 Start date: 10/1/2021, Start time: 71604, End Date: 10/1/2021, End time: 73116 --- CommitJob
19459 10:18:09 about apply whatif load : False --- CommitJob
19502 10:18:09 Rough cut scheduling 055027 False. Job start date 10/1/2021 Rough cut date 3/29/2022. --- CommitJob
19503: 10:18:09 Create RTU for Job 055027 Asmbl 6 Sequence 10 OpDtl 20 Whatif True. Resource M290 Start date: 10/1/2021, Start time: 73116, End Date: 10/1/2021, End time: 73116 --- CommitJob
19504 10:18:09 about apply whatif load : False --- CommitJob
19547 10:18:09 Rough cut scheduling 055027 False. Job start date 10/1/2021 Rough cut date 3/29/2022. --- CommitJob
19548: 10:18:09 Create RTU for Job 055027 Asmbl 7 Sequence 10 OpDtl 20 Whatif True. Resource M290 Start date: 10/1/2021, Start time: 73116, End Date: 10/1/2021, End time: 73116 --- CommitJob
19549 10:18:09 about apply whatif load : False --- CommitJob
19577 10:18:09 Rough cut scheduling 055027 False. Job start date 10/1/2021 Rough cut date 3/29/2022. --- CommitJob
19578: 10:18:09 Create RTU for Job 055027 Asmbl 8 Sequence 10 OpDtl 20 Whatif True. Resource M290 Start date: 10/1/2021, Start time: 73116, End Date: 10/1/2021, End time: 73116 --- CommitJob
19579 10:18:09 about apply whatif load : False --- CommitJob
20013 10:18:09 Rough cut scheduling 055027 False. Job start date 10/1/2021 Rough cut date 3/29/2022. --- CommitJob
20014: 10:18:09 Create RTU for Job 055027 Asmbl 19 Sequence 10 OpDtl 20 Whatif True. Resource M290 Start date: 10/1/2021, Start time: 67788, End Date: 10/1/2021, End time: 69516 --- CommitJob
20015 10:18:09 about apply whatif load : False --- CommitJob
I removed the lines referring to other resources to cut down on the size but I’m not seeing anything that would explain why it is choosing to overschedule.