Resource level shop load report?

All,

I'm on 9.05.702.

How do you run a shop load report, or equivalent report at the resource level? Until now, we've only ever used one resource for each resource group, so running shop load reports at the group level was never an issue. I recently created a new group made up of 4 resources. I would like to use the capabilities function to schedule jobs to specific resources within the group. I need to be able to measure the upcoming load vs capacity for each resource.

Thanks in advance,

Derek