Shipping report

I moved a job through visual scheduling such that the scheduled ship
date is 3/28/01 instead of the need date which is 3/25/01. However on
the shipping report this job is still listed to ship on 3/25/01. Is
there something else I need to do so that the shipping report is
accurate. Does anyone have a report that list job numbers, with the
ship date, need date and scheduled ship date or any report similar to
this.


Thank you
Venky