Table containing Scheduled resource information

That’s correct, have fun with that one!

Rob Bucek
Production Control Manager
PH: (715) 284-5376 ext 311
Mobile: (715)896-4832
FAX: (715)284-4084
[cid:1.234354861@...]<http://www.dsmfg.com/>
(Click the logo to view our site)<http://www.dsmfg.com/>

From: vantage@yahoogroups.com [mailto:vantage@yahoogroups.com] On Behalf Of sarah.vareschi@...
Sent: Tuesday, March 18, 2014 10:33 AM
To: vantage@yahoogroups.com
Subject: [Vantage] Re: Table containing Scheduled resource information



Sorry... it looks like the table is need is called "ResourceTimeUsed"



[Non-text portions of this message have been removed]

Hi - We are going live on Epicor 9.05 Monday... (from vantage 5.2).  One of the new (to us) features is resource scheduling.  The reports directly out of Epicor seem ok, but of course my users have very specific needs so they have asked for some additional resource scheduling reports.  I feel very silly, but I cannot seem to locate the table that contains the "Scheduled Resource" information.   I know if we assign the specific resource, that is on the JobOpdtl table, but when we do not assign a specific resource and the system assigns the resource during the scheduling process, does anybody know what table that information is stored in?  I looked in the DataSet relationships viewer and it references something called "Job Resources" but I can't find that (or anything that looks like that).  I am sure there is another way to find this information that I am not aware of, if anyone could point me in the right direction?

 

We are running Epicor 9.05.702A.

 

Thanks!

Sarah

Sorry...  it looks like the table is need is called "ResourceTimeUsed"