Selecting assemblies and operations in MES End Activity is SLOW

Jason, I’m looking at the Method Directives and, I believe, there’s nothing in them. Here are photos of the Detail, List, Pre-Processing, Base Processing, and Post-Processing.

Detail:
image

List:

Pre-Processing:

Base Processing:

Post-Processing:

Am I looking in the right area? I’ve never done anything with BPMs before so I’m not sure exactly what I’m looking for.