Shop Load Report

Hello,

When we run the “shop load report”, after a certain point in time (after the week of 11/21/21), unfirmed job load hours do not show up in the report, only firmed jobs. We do not firm up most jobs past a few weeks because of dynamic demand. Is there a setting we can change to bring back the load hours for unfirmed jobs out in the future ?