In talking to Epicor today about why our costs are not correct, we found that costs are not updated until a report is run. (ie inventory, stock, wip). So if the capture is run without running a report, the wip is captured incorrect.
Having said all this. We were told that “someone” out on the lists has written a BPM to run that little cost calculator that is attached to the reports. Anyone know who that someone might be? I would love to have that BPM gem.
Brenda
10.0.700.2