So, now I am thinking that for some reason, some operations are being considered as WhatIf....

After playing with the problem job some more, I had ended up with three OPs - 5, 15 and 30.
OP 30 an example of one without any dates.

When I looked at the JopOper records for that job.
There was one difference that stood out - OP 30, field WIName had my userID, for the other OPs it was blank.

Data Dictionary says ---
This field is blank or contains the UserID. When not blank it indicates that the operations schedule has been changed and is considered as being in a "What If" mode.
This field is also used as part of an index which allows the system to quickly find the operations that need to be reset to "Actual Schedule".



--- In vantage@yahoogroups.com, "cooner_55421" <cooner_55421@...> wrote:
>
> > Start simple.
> Thanks, I double checked but as far as I can tell, it is none of those.
>
> But, that gave me some ideas.
> It seems to just get stranger:
>
> Job - only one operation-20, no OP start date, no OP due date and no materials have due dates.
>
> I added the identical operation twice as 5 and 30 and moved some of the existing materials to both.
> Rescheduled.
> Now OP 5 has a start date and its related materials have due dates.
> OPs 20 and 30, still no dates.
> (Except OP 30 does have a due date).
>
> --- In vantage@yahoogroups.com, Robert Brown <robertb_versa@> wrote:
> >
> > Start simple. A job won't schedule if it is for an anapproved part rev or if any resource group/resource called for as an OP Dtl is set to inactive OR if the resources an OP will be scheduled into (even if you've defined your op dtl with a resource group) is finite and you've set up with a calendar that has zero hrs.
> > ÂÂ
> > The problem is usually self inflicted.ÂÂ
> >
> > From: Manasa Reddy <manasa@>
> > To: vantage@yahoogroups.com
> > Sent: Friday, August 19, 2011 2:18 PM
> > Subject: RE: [Vantage] Re: Missing Job Dates
> >
> >
> > ÂÂ
> > Then what is your sequence of events?
> >
> > We do the following:
> >
> > 1) Unengineer (which automatically removes the release check),
> >
> > 2) Remove from schedule
> >
> > 3) Delete the link to the SO (or make to stock or the job)
> >
> > 4) Make changes or delete the job entirely
> >
> > If you are doing something different than the above, try it and see what happens. Otherwise I suspect it is something in the patch, possibly?
> >
> > M. Manasa Reddy
> >
> > manasa@
> >
> > 630.806.2000 x1515
> >
> > ________________________________
> >
> > From: vantage@yahoogroups.com [mailto:vantage@yahoogroups.com] On Behalf Of cooner_55421
> > Sent: Friday, August 19, 2011 1:11 PM
> > To: vantage@yahoogroups.com
> > Subject: [Vantage] Re: Missing Job Dates
> >
> > >if you modify the job and don't reschedule it.
> > That's what has me stumped.
> > I've been rescheduling.
> > I've tried changing job due dates too.
> > Even removing the job from the schedule and then adding it back in.
> > I suspect there is a certain sequence that Vantage doesn't handle well and then it can't recover.
> >
> > --- In vantage@yahoogroups.com <mailto:vantage%40yahoogroups.com> , Steven Gotschall <sgotschall@> wrote:
> > >
> > > We discovered that this happens if you modify the job and don't reschedule it.
> > >
> > >
> > > From: cooner_55421 <cooner_55421@>
> > > To: vantage@yahoogroups.com <mailto:vantage%40yahoogroups.com>
> > > Sent: Friday, August 19, 2011 1:01 PM
> > > Subject: [Vantage] Missing Job Dates
> > >
> > >
> > > Â
> > > Hi,
> > >
> > > In 8.03.409C, occasionally I'll find blank dates related to jobs.
> > > The jobs are firm, engineered, released and scheduled but...
> > > These fields are sometimes blank (not both fields on the same job):
> > > - JobMtl.ReqDate
> > > - JobOper.StartDate (jobOper.DueDate is populated).
> > >
> > > Wondering if anybody has run into this, or any ideas where to look?
> > >
> > > I've tried removing/adding, rescheduling (both materials and operations).
> > > Nothing I've tried makes a difference.
> > >
> > > Only clue I have is for operations,
> > > - some are added as a last op, after the job had some activity on previous ops.
> > > - For materials, I haven't find anything that might be different for those with blank req dates.
> > >
> > > Thanks
> > >
> > >
> > >
> > >
> > > [Non-text portions of this message have been removed]
> > >
> >
> > [Non-text portions of this message have been removed]
> >
> >
> >
> >
> > [Non-text portions of this message have been removed]
> >
>
Hi,

In 8.03.409C, occasionally I'll find blank dates related to jobs.
The jobs are firm, engineered, released and scheduled but...
These fields are sometimes blank (not both fields on the same job):
- JobMtl.ReqDate
- JobOper.StartDate (jobOper.DueDate is populated).

Wondering if anybody has run into this, or any ideas where to look?

I've tried removing/adding, rescheduling (both materials and operations).
Nothing I've tried makes a difference.

Only clue I have is for operations,
- some are added as a last op, after the job had some activity on previous ops.
- For materials, I haven't find anything that might be different for those with blank req dates.

Thanks
We discovered that this happens if you modify the job and don't reschedule it.


From: cooner_55421 <cooner_55421@...>
To: vantage@yahoogroups.com
Sent: Friday, August 19, 2011 1:01 PM
Subject: [Vantage] Missing Job Dates


Â
Hi,

In 8.03.409C, occasionally I'll find blank dates related to jobs.
The jobs are firm, engineered, released and scheduled but...
These fields are sometimes blank (not both fields on the same job):
- JobMtl.ReqDate
- JobOper.StartDate (jobOper.DueDate is populated).

Wondering if anybody has run into this, or any ideas where to look?

I've tried removing/adding, rescheduling (both materials and operations).
Nothing I've tried makes a difference.

Only clue I have is for operations,
- some are added as a last op, after the job had some activity on previous ops.
- For materials, I haven't find anything that might be different for those with blank req dates.

Thanks




[Non-text portions of this message have been removed]
>if you modify the job and don't reschedule it.
That's what has me stumped.
I've been rescheduling.
I've tried changing job due dates too.
Even removing the job from the schedule and then adding it back in.
I suspect there is a certain sequence that Vantage doesn't handle well and then it can't recover.

--- In vantage@yahoogroups.com, Steven Gotschall <sgotschall@...> wrote:
>
> We discovered that this happens if you modify the job and don't reschedule it.
>
>
> From: cooner_55421 <cooner_55421@...>
> To: vantage@yahoogroups.com
> Sent: Friday, August 19, 2011 1:01 PM
> Subject: [Vantage] Missing Job Dates
>
>
> ÂÂ
> Hi,
>
> In 8.03.409C, occasionally I'll find blank dates related to jobs.
> The jobs are firm, engineered, released and scheduled but...
> These fields are sometimes blank (not both fields on the same job):
> - JobMtl.ReqDate
> - JobOper.StartDate (jobOper.DueDate is populated).
>
> Wondering if anybody has run into this, or any ideas where to look?
>
> I've tried removing/adding, rescheduling (both materials and operations).
> Nothing I've tried makes a difference.
>
> Only clue I have is for operations,
> - some are added as a last op, after the job had some activity on previous ops.
> - For materials, I haven't find anything that might be different for those with blank req dates.
>
> Thanks
>
>
>
>
> [Non-text portions of this message have been removed]
>
Then what is your sequence of events?



We do the following:



1) Unengineer (which automatically removes the release check),

2) Remove from schedule

3) Delete the link to the SO (or make to stock or the job)

4) Make changes or delete the job entirely



If you are doing something different than the above, try it and see what happens. Otherwise I suspect it is something in the patch, possibly?







M. Manasa Reddy

manasa@...

630.806.2000 x1515

________________________________

From: vantage@yahoogroups.com [mailto:vantage@yahoogroups.com] On Behalf Of cooner_55421
Sent: Friday, August 19, 2011 1:11 PM
To: vantage@yahoogroups.com
Subject: [Vantage] Re: Missing Job Dates





>if you modify the job and don't reschedule it.
That's what has me stumped.
I've been rescheduling.
I've tried changing job due dates too.
Even removing the job from the schedule and then adding it back in.
I suspect there is a certain sequence that Vantage doesn't handle well and then it can't recover.

--- In vantage@yahoogroups.com <mailto:vantage%40yahoogroups.com> , Steven Gotschall <sgotschall@...> wrote:
>
> We discovered that this happens if you modify the job and don't reschedule it.
>
>
> From: cooner_55421 <cooner_55421@...>
> To: vantage@yahoogroups.com <mailto:vantage%40yahoogroups.com>
> Sent: Friday, August 19, 2011 1:01 PM
> Subject: [Vantage] Missing Job Dates
>
>
> Â
> Hi,
>
> In 8.03.409C, occasionally I'll find blank dates related to jobs.
> The jobs are firm, engineered, released and scheduled but...
> These fields are sometimes blank (not both fields on the same job):
> - JobMtl.ReqDate
> - JobOper.StartDate (jobOper.DueDate is populated).
>
> Wondering if anybody has run into this, or any ideas where to look?
>
> I've tried removing/adding, rescheduling (both materials and operations).
> Nothing I've tried makes a difference.
>
> Only clue I have is for operations,
> - some are added as a last op, after the job had some activity on previous ops.
> - For materials, I haven't find anything that might be different for those with blank req dates.
>
> Thanks
>
>
>
>
> [Non-text portions of this message have been removed]
>





[Non-text portions of this message have been removed]
>Delete the link to the SO (or make to stock or the job)
Thanks, I don't think I've tried the links yet.

>something in the patch, possibly?
On a side note - 8.03.410 - is this one dead?

>> Then what is your sequence of events?
It's an intermittent issue that is reported to me after it has happened. So I usually don't know all the steps. For now, we list with a dashboard & handle them manually.

>or delete the job entirely
There is usually a reason why I can't just delete the job.

Thanks again



--- In vantage@yahoogroups.com, "Manasa Reddy" <manasa@...> wrote:
>
> Then what is your sequence of events?
>
>
>
> We do the following:
>
>
>
> 1) Unengineer (which automatically removes the release check),
>
> 2) Remove from schedule
>
> 3) Delete the link to the SO (or make to stock or the job)
>
> 4) Make changes or delete the job entirely
>
>
>
> If you are doing something different than the above, try it and see what happens. Otherwise I suspect it is something in the patch, possibly?
>
>
>
>
>
>
>
> M. Manasa Reddy
>
> manasa@...
>
> 630.806.2000 x1515
>
> ________________________________
>
> From: vantage@yahoogroups.com [mailto:vantage@yahoogroups.com] On Behalf Of cooner_55421
> Sent: Friday, August 19, 2011 1:11 PM
> To: vantage@yahoogroups.com
> Subject: [Vantage] Re: Missing Job Dates
>
>
>
>
>
> >if you modify the job and don't reschedule it.
> That's what has me stumped.
> I've been rescheduling.
> I've tried changing job due dates too.
> Even removing the job from the schedule and then adding it back in.
> I suspect there is a certain sequence that Vantage doesn't handle well and then it can't recover.
>
> --- In vantage@yahoogroups.com <mailto:vantage%40yahoogroups.com> , Steven Gotschall <sgotschall@> wrote:
> >
> > We discovered that this happens if you modify the job and don't reschedule it.
> >
> >
> > From: cooner_55421 <cooner_55421@>
> > To: vantage@yahoogroups.com <mailto:vantage%40yahoogroups.com>
> > Sent: Friday, August 19, 2011 1:01 PM
> > Subject: [Vantage] Missing Job Dates
> >
> >
> > Â
> > Hi,
> >
> > In 8.03.409C, occasionally I'll find blank dates related to jobs.
> > The jobs are firm, engineered, released and scheduled but...
> > These fields are sometimes blank (not both fields on the same job):
> > - JobMtl.ReqDate
> > - JobOper.StartDate (jobOper.DueDate is populated).
> >
> > Wondering if anybody has run into this, or any ideas where to look?
> >
> > I've tried removing/adding, rescheduling (both materials and operations).
> > Nothing I've tried makes a difference.
> >
> > Only clue I have is for operations,
> > - some are added as a last op, after the job had some activity on previous ops.
> > - For materials, I haven't find anything that might be different for those with blank req dates.
> >
> > Thanks
> >
> >
> >
> >
> > [Non-text portions of this message have been removed]
> >
>
>
>
>
>
> [Non-text portions of this message have been removed]
>
I completely understand any reason to not want to delete a job entirely.



So then try this in a test environment first...then you don't have to worry about the reasons why a job cannot be deleted entirely.



This way you will know for sure if this is the step that is screwing up the process for you.



Sorry I have absolutely no idea about patch 410.







M. Manasa Reddy

manasa@...

630.806.2000 x1515

________________________________

From: vantage@yahoogroups.com [mailto:vantage@yahoogroups.com] On Behalf Of cooner_55421
Sent: Friday, August 19, 2011 2:33 PM
To: vantage@yahoogroups.com
Subject: [Vantage] Re: Missing Job Dates






>Delete the link to the SO (or make to stock or the job)
Thanks, I don't think I've tried the links yet.

>something in the patch, possibly?
On a side note - 8.03.410 - is this one dead?

>> Then what is your sequence of events?
It's an intermittent issue that is reported to me after it has happened. So I usually don't know all the steps. For now, we list with a dashboard & handle them manually.

>or delete the job entirely
There is usually a reason why I can't just delete the job.

Thanks again

--- In vantage@yahoogroups.com <mailto:vantage%40yahoogroups.com> , "Manasa Reddy" <manasa@...> wrote:
>
> Then what is your sequence of events?
>
>
>
> We do the following:
>
>
>
> 1) Unengineer (which automatically removes the release check),
>
> 2) Remove from schedule
>
> 3) Delete the link to the SO (or make to stock or the job)
>
> 4) Make changes or delete the job entirely
>
>
>
> If you are doing something different than the above, try it and see what happens. Otherwise I suspect it is something in the patch, possibly?
>
>
>
>
>
>
>
> M. Manasa Reddy
>
> manasa@...
>
> 630.806.2000 x1515
>
> ________________________________
>
> From: vantage@yahoogroups.com <mailto:vantage%40yahoogroups.com> [mailto:vantage@yahoogroups.com <mailto:vantage%40yahoogroups.com> ] On Behalf Of cooner_55421
> Sent: Friday, August 19, 2011 1:11 PM
> To: vantage@yahoogroups.com <mailto:vantage%40yahoogroups.com>
> Subject: [Vantage] Re: Missing Job Dates
>
>
>
>
>
> >if you modify the job and don't reschedule it.
> That's what has me stumped.
> I've been rescheduling.
> I've tried changing job due dates too.
> Even removing the job from the schedule and then adding it back in.
> I suspect there is a certain sequence that Vantage doesn't handle well and then it can't recover.
>
> --- In vantage@yahoogroups.com <mailto:vantage%40yahoogroups.com> <mailto:vantage%40yahoogroups.com> , Steven Gotschall <sgotschall@> wrote:
> >
> > We discovered that this happens if you modify the job and don't reschedule it.
> >
> >
> > From: cooner_55421 <cooner_55421@>
> > To: vantage@yahoogroups.com <mailto:vantage%40yahoogroups.com> <mailto:vantage%40yahoogroups.com>
> > Sent: Friday, August 19, 2011 1:01 PM
> > Subject: [Vantage] Missing Job Dates
> >
> >
> > Â
> > Hi,
> >
> > In 8.03.409C, occasionally I'll find blank dates related to jobs.
> > The jobs are firm, engineered, released and scheduled but...
> > These fields are sometimes blank (not both fields on the same job):
> > - JobMtl.ReqDate
> > - JobOper.StartDate (jobOper.DueDate is populated).
> >
> > Wondering if anybody has run into this, or any ideas where to look?
> >
> > I've tried removing/adding, rescheduling (both materials and operations).
> > Nothing I've tried makes a difference.
> >
> > Only clue I have is for operations,
> > - some are added as a last op, after the job had some activity on previous ops.
> > - For materials, I haven't find anything that might be different for those with blank req dates.
> >
> > Thanks
> >
> >
> >
> >
> > [Non-text portions of this message have been removed]
> >
>
>
>
>
>
> [Non-text portions of this message have been removed]
>





[Non-text portions of this message have been removed]
The last I heard about 8.03.410 was that it was slated for release in December.


From: cooner_55421 <cooner_55421@...>
To: vantage@yahoogroups.com
Sent: Friday, August 19, 2011 3:32 PM
Subject: [Vantage] Re: Missing Job Dates


Â

>Delete the link to the SO (or make to stock or the job)
Thanks, I don't think I've tried the links yet.

>something in the patch, possibly?
On a side note - 8.03.410 - is this one dead?

>> Then what is your sequence of events?
It's an intermittent issue that is reported to me after it has happened. So I usually don't know all the steps. For now, we list with a dashboard & handle them manually.

>or delete the job entirely
There is usually a reason why I can't just delete the job.

Thanks again

--- In vantage@yahoogroups.com, "Manasa Reddy" <manasa@...> wrote:
>
> Then what is your sequence of events?
>
>
>
> We do the following:
>
>
>
> 1) Unengineer (which automatically removes the release check),
>
> 2) Remove from schedule
>
> 3) Delete the link to the SO (or make to stock or the job)
>
> 4) Make changes or delete the job entirely
>
>
>
> If you are doing something different than the above, try it and see what happens. Otherwise I suspect it is something in the patch, possibly?
>
>
>
>
>
>
>
> M. Manasa Reddy
>
> manasa@...
>
> 630.806.2000 x1515
>
> ________________________________
>
> From: vantage@yahoogroups.com [mailto:vantage@yahoogroups.com] On Behalf Of cooner_55421
> Sent: Friday, August 19, 2011 1:11 PM
> To: vantage@yahoogroups.com
> Subject: [Vantage] Re: Missing Job Dates
>
>
>
>
>
> >if you modify the job and don't reschedule it.
> That's what has me stumped.
> I've been rescheduling.
> I've tried changing job due dates too.
> Even removing the job from the schedule and then adding it back in.
> I suspect there is a certain sequence that Vantage doesn't handle well and then it can't recover.
>
> --- In vantage@yahoogroups.com <mailto:vantage%40yahoogroups.com> , Steven Gotschall <sgotschall@> wrote:
> >
> > We discovered that this happens if you modify the job and don't reschedule it.
> >
> >
> > From: cooner_55421 <cooner_55421@>
> > To: vantage@yahoogroups.com <mailto:vantage%40yahoogroups.com>
> > Sent: Friday, August 19, 2011 1:01 PM
> > Subject: [Vantage] Missing Job Dates
> >
> >
> > Â
> > Hi,
> >
> > In 8.03.409C, occasionally I'll find blank dates related to jobs.
> > The jobs are firm, engineered, released and scheduled but...
> > These fields are sometimes blank (not both fields on the same job):
> > - JobMtl.ReqDate
> > - JobOper.StartDate (jobOper.DueDate is populated).
> >
> > Wondering if anybody has run into this, or any ideas where to look?
> >
> > I've tried removing/adding, rescheduling (both materials and operations).
> > Nothing I've tried makes a difference.
> >
> > Only clue I have is for operations,
> > - some are added as a last op, after the job had some activity on previous ops.
> > - For materials, I haven't find anything that might be different for those with blank req dates.
> >
> > Thanks
> >
> >
> >
> >
> > [Non-text portions of this message have been removed]
> >
>
>
>
>
>
> [Non-text portions of this message have been removed]
>




[Non-text portions of this message have been removed]
Vantage 8.03.409C

Finally, someone else finding this an issue.

Been seeing this for some time now, including previous versions. Unable to pin-point any common variable and getting it to repeat. Right now the closest thing we have is seeing it mostly after running a Global Reschedule. In earlier versions we would see it after scheduling a Job or, as mentioned, editing a Job and then losing informaiton.

Would love to be able to make this go away.

Jeff

--- In vantage@yahoogroups.com, "cooner_55421" <cooner_55421@...> wrote:
>
> Hi,
>
> In 8.03.409C, occasionally I'll find blank dates related to jobs.
> The jobs are firm, engineered, released and scheduled but...
> These fields are sometimes blank (not both fields on the same job):
> - JobMtl.ReqDate
> - JobOper.StartDate (jobOper.DueDate is populated).
>
> Wondering if anybody has run into this, or any ideas where to look?
>
> I've tried removing/adding, rescheduling (both materials and operations).
> Nothing I've tried makes a difference.
>
> Only clue I have is for operations,
> - some are added as a last op, after the job had some activity on previous ops.
> - For materials, I haven't find anything that might be different for those with blank req dates.
>
> Thanks
>
Start simple. A job won't schedule if it is for an anapproved part rev or if any resource group/resource called for as an OP Dtl is set to inactive OR if the resources an OP will be scheduled into (even if you've defined your op dtl with a resource group) is finite and you've set up with a calendar that has zero hrs.
Â
The problem is usually self inflicted.Â

From: Manasa Reddy <manasa@...>
To: vantage@yahoogroups.com
Sent: Friday, August 19, 2011 2:18 PM
Subject: RE: [Vantage] Re: Missing Job Dates


Â
Then what is your sequence of events?

We do the following:

1) Unengineer (which automatically removes the release check),

2) Remove from schedule

3) Delete the link to the SO (or make to stock or the job)

4) Make changes or delete the job entirely

If you are doing something different than the above, try it and see what happens. Otherwise I suspect it is something in the patch, possibly?

M. Manasa Reddy

manasa@...

630.806.2000 x1515

________________________________

From: vantage@yahoogroups.com [mailto:vantage@yahoogroups.com] On Behalf Of cooner_55421
Sent: Friday, August 19, 2011 1:11 PM
To: vantage@yahoogroups.com
Subject: [Vantage] Re: Missing Job Dates

>if you modify the job and don't reschedule it.
That's what has me stumped.
I've been rescheduling.
I've tried changing job due dates too.
Even removing the job from the schedule and then adding it back in.
I suspect there is a certain sequence that Vantage doesn't handle well and then it can't recover.

--- In vantage@yahoogroups.com <mailto:vantage%40yahoogroups.com> , Steven Gotschall <sgotschall@...> wrote:
>
> We discovered that this happens if you modify the job and don't reschedule it.
>
>
> From: cooner_55421 <cooner_55421@...>
> To: vantage@yahoogroups.com <mailto:vantage%40yahoogroups.com>
> Sent: Friday, August 19, 2011 1:01 PM
> Subject: [Vantage] Missing Job Dates
>
>
> Â
> Hi,
>
> In 8.03.409C, occasionally I'll find blank dates related to jobs.
> The jobs are firm, engineered, released and scheduled but...
> These fields are sometimes blank (not both fields on the same job):
> - JobMtl.ReqDate
> - JobOper.StartDate (jobOper.DueDate is populated).
>
> Wondering if anybody has run into this, or any ideas where to look?
>
> I've tried removing/adding, rescheduling (both materials and operations).
> Nothing I've tried makes a difference.
>
> Only clue I have is for operations,
> - some are added as a last op, after the job had some activity on previous ops.
> - For materials, I haven't find anything that might be different for those with blank req dates.
>
> Thanks
>
>
>
>
> [Non-text portions of this message have been removed]
>

[Non-text portions of this message have been removed]




[Non-text portions of this message have been removed]
> Start simple.
Thanks, I double checked but as far as I can tell, it is none of those.

But, that gave me some ideas.
It seems to just get stranger:

Job - only one operation-20, no OP start date, no OP due date and no materials have due dates.

I added the identical operation twice as 5 and 30 and moved some of the existing materials to both.
Rescheduled.
Now OP 5 has a start date and its related materials have due dates.
OPs 20 and 30, still no dates.
(Except OP 30 does have a due date).

--- In vantage@yahoogroups.com, Robert Brown <robertb_versa@...> wrote:
>
> Start simple. A job won't schedule if it is for an anapproved part rev or if any resource group/resource called for as an OP Dtl is set to inactive OR if the resources an OP will be scheduled into (even if you've defined your op dtl with a resource group) is finite and you've set up with a calendar that has zero hrs.
> ÂÂ
> The problem is usually self inflicted.ÂÂ
>
> From: Manasa Reddy <manasa@...>
> To: vantage@yahoogroups.com
> Sent: Friday, August 19, 2011 2:18 PM
> Subject: RE: [Vantage] Re: Missing Job Dates
>
>
> ÂÂ
> Then what is your sequence of events?
>
> We do the following:
>
> 1) Unengineer (which automatically removes the release check),
>
> 2) Remove from schedule
>
> 3) Delete the link to the SO (or make to stock or the job)
>
> 4) Make changes or delete the job entirely
>
> If you are doing something different than the above, try it and see what happens. Otherwise I suspect it is something in the patch, possibly?
>
> M. Manasa Reddy
>
> manasa@...
>
> 630.806.2000 x1515
>
> ________________________________
>
> From: vantage@yahoogroups.com [mailto:vantage@yahoogroups.com] On Behalf Of cooner_55421
> Sent: Friday, August 19, 2011 1:11 PM
> To: vantage@yahoogroups.com
> Subject: [Vantage] Re: Missing Job Dates
>
> >if you modify the job and don't reschedule it.
> That's what has me stumped.
> I've been rescheduling.
> I've tried changing job due dates too.
> Even removing the job from the schedule and then adding it back in.
> I suspect there is a certain sequence that Vantage doesn't handle well and then it can't recover.
>
> --- In vantage@yahoogroups.com <mailto:vantage%40yahoogroups.com> , Steven Gotschall <sgotschall@> wrote:
> >
> > We discovered that this happens if you modify the job and don't reschedule it.
> >
> >
> > From: cooner_55421 <cooner_55421@>
> > To: vantage@yahoogroups.com <mailto:vantage%40yahoogroups.com>
> > Sent: Friday, August 19, 2011 1:01 PM
> > Subject: [Vantage] Missing Job Dates
> >
> >
> > Â
> > Hi,
> >
> > In 8.03.409C, occasionally I'll find blank dates related to jobs.
> > The jobs are firm, engineered, released and scheduled but...
> > These fields are sometimes blank (not both fields on the same job):
> > - JobMtl.ReqDate
> > - JobOper.StartDate (jobOper.DueDate is populated).
> >
> > Wondering if anybody has run into this, or any ideas where to look?
> >
> > I've tried removing/adding, rescheduling (both materials and operations).
> > Nothing I've tried makes a difference.
> >
> > Only clue I have is for operations,
> > - some are added as a last op, after the job had some activity on previous ops.
> > - For materials, I haven't find anything that might be different for those with blank req dates.
> >
> > Thanks
> >
> >
> >
> >
> > [Non-text portions of this message have been removed]
> >
>