Hi all,
I’d like to know if a part swapped into a method via configurator which then has it’s part number changed will still consume stock of the original swapped in part.
So:
- Stock part exists in configurable part method.
- Part number is changed to unique value for the job during configuration.
- Original stock part is still consumed.
Is this the case?