The 400 page configurator pdf explained that there are 2 ways to setup configurators; 1. Super BOM 2. Template BOM. The template BOM is supposed to be hard to establish, and easier to maintain. All of our builds have 2 intregal parts (service bodies/Flatbeds), everything else is added(installed). Nothing leaves out of here uninstalled. So does that make everything else an OPTION?
I wasn’t asking about pulling the BOMs into anything. I want to know how, thru a configurator, does EPICOR know what materials, operations, and Methods to pull together. What do we have to do to make that happen?