Vantage 8.03 Quote Costing Detail table location

I would try Epicor support or EpicWeb first.

Here is part of an old answerbook 259.2236MPSS.
But it is for V5 & I think too many things have changed since then.

>>QM - How Costs are calculated on the Quote Worksheet
>>Detail Unit Cost: Quote Quantity of One
>>
>>Labor Cost:= [(Production PLR / Production STANDARD)+(Setup PLR x >>Setup
>>STANDARD)]
>>
>>Burden Cost:= [(Production PBR / Production STANDARD)+(Setup PBR x >>Setup
>>STANDARD)]
>>
>>Total Cost: (Labor Cost + Burden Cost) x Quote Quantity
>>
>>Detail Unit Cost: Where Quote Quantity of 'n' is greater than One
>>
>>Labor Cost:= {(Production PLR / Production STANDARD)+[(Setup PLR x >>Setup
>>STANDARD)/n]}
>>
>>Burden Cost:={[(Production PBR / Production STANDARD)+[(Setup PBR x >>Setup
>>STANDARD)/n]}
>>
>>Total Cost: (Labor Cost + Burden Cost) x Quote Quantity
>>
>>Assembly Totals:
>>
>>Quantity: Quanity quoted (setup on Quote Line Detail)
>>Setup Hours: Sum of all Setup hours per Operation
>>Production Hours: Sum of all Production hours per Operation
>>Material Cost: Sum of all Material costs per operation (including >>scrap)
>>Labor Cost: Sum of all Detail Unit Labor Costs
>>Burden Cost: Sum of all Detail Unit Burden Costs
>>Subcontract Cost: Sum of all Subcontract Costs per Operation



--- In vantage@yahoogroups.com, Mike Abell <mabell@...> wrote:
>
> Anyway to "figure out" what the details of the "on the fly" calculation are? Anyway to view a "EpiCor view" detail?
>
> Mike Abell
> Systems Analyst / Network Administrator
> Flexial - BOA Group - Cookeville, Tennessee
> Office: 931.432.1853 ext 302
> Mobile: 615.418.3055
> email: MAbell@...
>
>
> From: vantage@yahoogroups.com [mailto:vantage@yahoogroups.com] On Behalf Of b_ordway
> Sent: Friday, March 22, 2013 3:53 PM
> To: vantage@yahoogroups.com
> Subject: [Vantage] Re: Vantage 8.03 Quote Costing Detail table location
>
>
>
> >> BUT the fields that are mentioned
> >> for the total costs
> I think QuoteQty used in the Quote form is an Epicor view.
> So the the totals are calculated on the fly and not stored in QuoteQty table.
> I expect you'll need to duplicate each of these as calculated fields in your BAQ or report.
>
> --- In vantage@yahoogroups.com<mailto:vantage%40yahoogroups.com>, Mike Abell <mabell@<mailto:mabell@>> wrote:
> >
> > Thanks guys but the odd thing is in the customization for Quote Tracker it
> > does indeed reference the QuoteQty table BUT the fields that are mentioned
> > for the total costs of the Material, Labor, Burden, SubContract are NOT in
> > the QuoteQty table when I look at it Data Dictionary so I'm not sure what
> > the deal is there. Any ideas?
> >
> >
> >
> > Mike.
> >
> >
> >
> > From: vantage@yahoogroups.com<mailto:vantage%40yahoogroups.com> [mailto:vantage@yahoogroups.com<mailto:vantage%40yahoogroups.com>] On Behalf Of
> > b_ordway
> > Sent: Friday, March 22, 2013 1:56 PM
> > To: vantage@yahoogroups.com<mailto:vantage%40yahoogroups.com>
> > Subject: [Vantage] Re: Vantage 8.03 Quote Costing Detail table location
> >
> >
> >
> >
> >
> > I think the QuoteQty table might be what you are looking for.
> >
> > --- In vantage@yahoogroups.com<mailto:vantage%40yahoogroups.com> <mailto:vantage%40yahoogroups.com> , Mike
> > Abell <mabell@> wrote:
> > >
> > > Can someone give me some insight to what table contains the costing
> > information that shows up in quote tracker under the "worksheet" tab. I'd
> > like to use those costs in a report but can't find the data. Thanks!
> > >
> > > Mike Abell
> > > Systems Analyst / Network Administrator
> > > Flexial - BOA Group - Cookeville, Tennessee
> > > Office: 931.432.1853 ext 302
> > > Mobile: 615.418.3055
> > > email: MAbell@
> > >
> > >
> > >
> > >
> > > [Non-text portions of this message have been removed]
> > >
> >
> >
> >
> >
> >
> > [Non-text portions of this message have been removed]
> >
>
>
>
> [Non-text portions of this message have been removed]
>
Can someone give me some insight to what table contains the costing information that shows up in quote tracker under the "worksheet" tab. I'd like to use those costs in a report but can't find the data. Thanks!

Mike Abell
Systems Analyst / Network Administrator
Flexial - BOA Group - Cookeville, Tennessee
Office: 931.432.1853 ext 302
Mobile: 615.418.3055
email: MAbell@...




[Non-text portions of this message have been removed]
They are in the QuoteQty table.
The trick I always use is to go into a Customization (assuming you have access to customize sheets) then click on the field and look at the properties.
Kurt H

--- In vantage@yahoogroups.com, Mike Abell <mabell@...> wrote:
>
> Can someone give me some insight to what table contains the costing information that shows up in quote tracker under the "worksheet" tab. I'd like to use those costs in a report but can't find the data. Thanks!
>
> Mike Abell
> Systems Analyst / Network Administrator
> Flexial - BOA Group - Cookeville, Tennessee
> Office: 931.432.1853 ext 302
> Mobile: 615.418.3055
> email: MAbell@...
>
>
>
>
> [Non-text portions of this message have been removed]
>
I think the QuoteQty table might be what you are looking for.


--- In vantage@yahoogroups.com, Mike Abell <mabell@...> wrote:
>
> Can someone give me some insight to what table contains the costing information that shows up in quote tracker under the "worksheet" tab. I'd like to use those costs in a report but can't find the data. Thanks!
>
> Mike Abell
> Systems Analyst / Network Administrator
> Flexial - BOA Group - Cookeville, Tennessee
> Office: 931.432.1853 ext 302
> Mobile: 615.418.3055
> email: MAbell@...
>
>
>
>
> [Non-text portions of this message have been removed]
>
Thanks guys but the odd thing is in the customization for Quote Tracker it
does indeed reference the QuoteQty table BUT the fields that are mentioned
for the total costs of the Material, Labor, Burden, SubContract are NOT in
the QuoteQty table when I look at it Data Dictionary so I'm not sure what
the deal is there. Any ideas?



Mike.



From: vantage@yahoogroups.com [mailto:vantage@yahoogroups.com] On Behalf Of
b_ordway
Sent: Friday, March 22, 2013 1:56 PM
To: vantage@yahoogroups.com
Subject: [Vantage] Re: Vantage 8.03 Quote Costing Detail table location





I think the QuoteQty table might be what you are looking for.

--- In vantage@yahoogroups.com <mailto:vantage%40yahoogroups.com> , Mike
Abell <mabell@...> wrote:
>
> Can someone give me some insight to what table contains the costing
information that shows up in quote tracker under the "worksheet" tab. I'd
like to use those costs in a report but can't find the data. Thanks!
>
> Mike Abell
> Systems Analyst / Network Administrator
> Flexial - BOA Group - Cookeville, Tennessee
> Office: 931.432.1853 ext 302
> Mobile: 615.418.3055
> email: MAbell@...
>
>
>
>
> [Non-text portions of this message have been removed]
>





[Non-text portions of this message have been removed]
>> BUT the fields that are mentioned
>> for the total costs
I think QuoteQty used in the Quote form is an Epicor view.
So the the totals are calculated on the fly and not stored in QuoteQty table.
I expect you'll need to duplicate each of these as calculated fields in your BAQ or report.


--- In vantage@yahoogroups.com, Mike Abell <mabell@...> wrote:
>
> Thanks guys but the odd thing is in the customization for Quote Tracker it
> does indeed reference the QuoteQty table BUT the fields that are mentioned
> for the total costs of the Material, Labor, Burden, SubContract are NOT in
> the QuoteQty table when I look at it Data Dictionary so I'm not sure what
> the deal is there. Any ideas?
>
>
>
> Mike.
>
>
>
> From: vantage@yahoogroups.com [mailto:vantage@yahoogroups.com] On Behalf Of
> b_ordway
> Sent: Friday, March 22, 2013 1:56 PM
> To: vantage@yahoogroups.com
> Subject: [Vantage] Re: Vantage 8.03 Quote Costing Detail table location
>
>
>
>
>
> I think the QuoteQty table might be what you are looking for.
>
> --- In vantage@yahoogroups.com <mailto:vantage%40yahoogroups.com> , Mike
> Abell <mabell@> wrote:
> >
> > Can someone give me some insight to what table contains the costing
> information that shows up in quote tracker under the "worksheet" tab. I'd
> like to use those costs in a report but can't find the data. Thanks!
> >
> > Mike Abell
> > Systems Analyst / Network Administrator
> > Flexial - BOA Group - Cookeville, Tennessee
> > Office: 931.432.1853 ext 302
> > Mobile: 615.418.3055
> > email: MAbell@
> >
> >
> >
> >
> > [Non-text portions of this message have been removed]
> >
>
>
>
>
>
> [Non-text portions of this message have been removed]
>
Anyway to "figure out" what the details of the "on the fly" calculation are? Anyway to view a "EpiCor view" detail?

Mike Abell
Systems Analyst / Network Administrator
Flexial - BOA Group - Cookeville, Tennessee
Office: 931.432.1853 ext 302
Mobile: 615.418.3055
email: MAbell@...


From: vantage@yahoogroups.com [mailto:vantage@yahoogroups.com] On Behalf Of b_ordway
Sent: Friday, March 22, 2013 3:53 PM
To: vantage@yahoogroups.com
Subject: [Vantage] Re: Vantage 8.03 Quote Costing Detail table location



>> BUT the fields that are mentioned
>> for the total costs
I think QuoteQty used in the Quote form is an Epicor view.
So the the totals are calculated on the fly and not stored in QuoteQty table.
I expect you'll need to duplicate each of these as calculated fields in your BAQ or report.

--- In vantage@yahoogroups.com<mailto:vantage%40yahoogroups.com>, Mike Abell <mabell@...<mailto:mabell@...>> wrote:
>
> Thanks guys but the odd thing is in the customization for Quote Tracker it
> does indeed reference the QuoteQty table BUT the fields that are mentioned
> for the total costs of the Material, Labor, Burden, SubContract are NOT in
> the QuoteQty table when I look at it Data Dictionary so I'm not sure what
> the deal is there. Any ideas?
>
>
>
> Mike.
>
>
>
> From: vantage@yahoogroups.com<mailto:vantage%40yahoogroups.com> [mailto:vantage@yahoogroups.com<mailto:vantage%40yahoogroups.com>] On Behalf Of
> b_ordway
> Sent: Friday, March 22, 2013 1:56 PM
> To: vantage@yahoogroups.com<mailto:vantage%40yahoogroups.com>
> Subject: [Vantage] Re: Vantage 8.03 Quote Costing Detail table location
>
>
>
>
>
> I think the QuoteQty table might be what you are looking for.
>
> --- In vantage@yahoogroups.com<mailto:vantage%40yahoogroups.com> <mailto:vantage%40yahoogroups.com> , Mike
> Abell <mabell@> wrote:
> >
> > Can someone give me some insight to what table contains the costing
> information that shows up in quote tracker under the "worksheet" tab. I'd
> like to use those costs in a report but can't find the data. Thanks!
> >
> > Mike Abell
> > Systems Analyst / Network Administrator
> > Flexial - BOA Group - Cookeville, Tennessee
> > Office: 931.432.1853 ext 302
> > Mobile: 615.418.3055
> > email: MAbell@
> >
> >
> >
> >
> > [Non-text portions of this message have been removed]
> >
>
>
>
>
>
> [Non-text portions of this message have been removed]
>



[Non-text portions of this message have been removed]