Change BPM from Pre to Post

Does Epicor offer an easy way to move a BPM from Pre-processing to Post-processing? We have a created a fairly intricate one that is not firing quite right on the pre and I think it would be better suited to the post.

I’m not hopeful that Epicor has a way to move them easily, but I could be wrong.

You can copy and paste the diagram (or even sections of it) in the method builder from one BPM to another.

Obviously not all data and actions are available in both pre-and post- MD’s so som tweaking might be required.

You just saved me 25 minutes of tedious work with that trick. Thank you!

I use it mostly to copy widgets within a BPM. Making Message boxes (for debugging and development) is so time consuming. Copy and Paste FTW!