Has anyone had success using MRSB to take a job, change the scheduling blocks to 2, and then move the 2nd block to another resource? I keep getting 2 blocks stacked on top of each other on the same resource when I attempt to move one.
Ultimately I am trying to run 1 job operation on 2 machines located within the same resource group parallel to each other to cut the lead time in half.
If I am going about this the wrong way, please let me know of alternate methods.
10.0.700.4
Ultimately I am trying to run 1 job operation on 2 machines located within the same resource group parallel to each other to cut the lead time in half.
If I am going about this the wrong way, please let me know of alternate methods.
10.0.700.4
Thanks,
Craig